Browse
Search
Report on Amendments to the Carrboro Land Use Ordinance for Implementation to the Facilitated Small Area Plan for Carrboro's Northern Study Area
OrangeCountyNC
>
BOCC Archives
>
Reports
>
Report on Amendments to the Carrboro Land Use Ordinance for Implementation to the Facilitated Small Area Plan for Carrboro's Northern Study Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2013 10:36:52 AM
Creation date
4/30/2013 10:36:34 AM
Metadata
Fields
Template:
BOCC
Date
3/16/1999
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
10b
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I - permits shall be identified and evaluated by the developer and reviewed by the <br /> 2 town engineer, staff and the environmental advisory board. The developer shall <br /> 3 implement mitigation measures as are determined to be necessary by the town, <br /> 4 based upon the results of this evaluation,to prevent the predicted impacts. <br /> 5 Potential impacts to be evaluated may include,but are not limited to,backwater <br /> 6 effects on upstream properties,increased volumes or rates of stormwater flow, <br /> 7 offsite sedimentation,erosion and/or ground-cover loss downstream, increased <br /> 8 scouring of any downstream streambed, lowered quality of water due to the <br /> 9 pollutants carried in runoff,or any damage that materially injures the value of <br /> 10 adjoining or abutting property. The area of study is not limited to the property <br /> 11 being developed. <br /> 12 <br /> 13 (2) Prior to consideration by the permit issuing board,the developer shall,through a <br /> 14 qualified professional, submit a statement specifically identifying and quantifying any <br /> 15 potential negative stormwater effects the proposed development may have on upstream <br /> 16 or downstream properties or water quality. The permit issuing authority may require <br /> 17 modifications to the stormwater control plans to achieve compliance with the <br /> 18 objectives of this section. If and to the extent that the Board does not require changes <br /> 19 to the stormwater control system to eliminate any potential negative effects,then such <br /> 20 negative effects shall not thereafter be regarded as"damage"for purposes of <br /> 21 subsequent enforcement of this section. <br /> 22 <br /> 23 (3) Except as provided in subdivision(2) above, approval by the town of a developer's <br /> 24 stormwater control plans, and construction by the developer of the facilities as shown <br /> 25 in such plans, shall not relieve the developer of the responsibility of satisfying the"no <br /> 26 damage" standard set forth above. If at any time prior to two years following the <br /> 27 issuance of a certificate of occupancy (for an unsubdivided development)or the <br /> 28 approval of a final plat(for a subdivision) the town determines that the stormwater <br /> 29 facilities planned to be installed or actually installed to meet the requirements of this <br /> 30 section are inadequate,the town may require the submission of revised plans and the <br /> 31 installation of new,altered, or additional facilities to bring the development into <br /> 32 compliance. Prior to issuance of a certificate of occupancy or approval of a final plat, <br /> 33 the town may require the developer to post a performance bond or other sufficient <br /> 34 surety to guarantee compliance with this section. <br /> 35 <br /> 36 (4) Except as set forth in subdivision (3) above, this section shall impose no obligation on a <br /> 37 developer (or any successor to the developer) to modify or alter stormwater facilities <br /> 38 installed in accordance with approved plans or to construct new or additional facilities. <br /> 39 However, stormwater facilities shall be properly maintained so that they continue to <br /> 40 perform as they were designed to perform. All developments shall be constructed and <br /> 41 maintained so that they do not cause damage to other properties with their surface waters. <br /> 42 <br /> ................................... <br /> .................................................... <br /> -........................ <br /> ..........................._...._........................................ ...................... ............... ..................................... <br /> (Page 28 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.