Browse
Search
1999 NS Housing - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1999
>
1999 NS Housing - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2013 12:17:12 PM
Creation date
4/24/2013 12:15:25 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1999
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8h
Document Relationships
Agenda - 01-19-1999 - 8h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1999\Agenda - 01-19-1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phebe English <br /> 215 Sanders Rd. <br /> Efland,NC 27243 <br /> 563-6795 <br /> 2/2198 <br /> EXTERIOR: <br /> 1. Remove the gable window. <br /> 2. Install a crawl space,access door on the right rear of <br /> the house.Door to be door of pressure treated lumber with <br /> galvanized locking hasp and hinges. <br /> 3. Install three gable vents. <br /> 4. Close all holes in the foundation with block and mortar. <br /> 5. Install vinyl siding and trim.Install aluminum fascia <br /> and soffitt. Install aluminum door and window trim.Extend <br /> window trim as necessary for proper installation of aluminum <br /> trim and siding.Install siding and trim on the porch ceiling. <br /> ROOF: <br /> 1. Remove the roof covering to the sheathing. Install 151b. <br /> felt, aluminum drip edge and three tab shingles on the front <br /> side only. Flash and counter flash the chimneys. <br /> 2. Reframe the gable overhangs to accommodate a 6 <br /> inch soffitt.Install sheathing to match the existing. <br /> 3. Install new fascia on the new barge rafters <br /> 3. Prepare the rear sections of the roof for a rubberized <br /> roof system. Install 3/4"insulation board a rubberized roof <br /> system and all required flashing. <br /> GUTTER AND DOWNSPOUTS: <br /> 1. Install aluminum,continuous gutter and downspouts. <br /> Install concrete splashblocks under each downspout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.