Orange County NC Website
• 20 - Homestead Exemption <br /> • 29 - Local Government Regulation of Development <br /> Commissioner Rich asked to switch out item 2, roads for item 3, and bio-solids. <br /> Commissioner Dorosin and Commissioner McKee accepted the friendly amendment. <br /> Commissioner Dorosin read the amended items as follows: <br /> • 3 - Bio-solids Disposal <br /> • 7 - Smart Start and More at Four <br /> • 12 - Mental Health <br /> • 20 - Homestead Exemption <br /> • 29 - Local Government Regulation of Development <br /> VOTE: UNANIMOUS <br /> 7. Regular Agenda <br /> a. North Carolina State Clearinghouse Request for Intergovernmental Review <br /> of Proposed Private Crossing Closures with the North Carolina Railroad (NCRR)-Norfolk <br /> Southern (NS) Railway <br /> The Board received information on the North Carolina Department of Transportation <br /> (NCDOT) proposal to close private North Carolina Railroad (NCRR)/Norfolk Southern (NS) <br /> Railway crossings at Gordon Thomas Drive, Greenbriar Drive and Byrdsville Road in Orange <br /> County, and considered a second letter submitting scoping comments related to the project. <br /> Abigaile Pittman said that the Planning and Inspection Department received a <br /> solicitation for spoken comments from the NCDOT in September 2012 regarding the three <br /> railroad closures mentioned above. She said this track is part of the Southeast High Speed <br /> Rail Corridor which, when complete, will provide rail service between Washington DC and <br /> Charlotte, NC. Initial comments from the Commissioners October 16th meeting were sent to <br /> the NCDOT Rail Division in November 2012 and a response letter was received in December. <br /> This letter is included as Attachment 3 in the 7-a abstract. She said that public information <br /> workshop sessions have been held for all three closures and revised project study maps have <br /> been included as attachment 2 in the abstract. She noted that comments from the workshops <br /> are included as attachment 4 and a second set of comments for the NCDOT Rail Division has <br /> been drafted and is included as attachment 5. She referenced the revised maps of the <br /> proposed closings and reviewed the layouts. She said that the planning staff suggests several <br /> comments for the second letter and she listed the following: <br /> • Greater clarity is needed regarding which alternative access roads will be publicly <br /> improved and/or constructed roads accepted into the state system for maintenance. <br /> • More specific details are needed regarding the proposed right of way width, pavement <br /> width, drainage ditches, etc. <br /> • When available the anticipated schedule is needed for required right-of-way <br /> acquisition, relocation of property structures and buildings where necessary, and <br /> construction dates. <br /> • Clarifying details are needed with regard to improvements to alternate access. <br /> Abigail Pittman said that there are also other site specific comments, included in <br /> abstract attachment 5 on pages 4 and 5, and she read those comments. <br />