Orange County NC Website
ATTACHMENT B <br />Northern Human Services Center Development Option Comparison <br />Abatement, Removal <br />Design, Construction, Equipment <br />Contingency <br />Schematic Budget Estimate <br />Schematic Budget per square foot <br />Considerations: <br />Development and Construction Cost <br />Design Flexibility <br />Programmed Use Flexibility <br />Unforeseen Conditions <br />Original Structure's Use? <br />Estimated Future Operating Costs <br />Option 1 <br />New Construction, 10,000 square foot pre - <br />engineered metal building, standing seam <br />roof, masonry and /or block accented <br />exterior walls; standard interior upfit <br />Option 2 <br />Removal of classroom wings, adaptive <br />re -use of 10,000 square foot center <br />portion; new roof and building systems; <br />standard interior upfit <br />$220K - $250K <br />$175K - $225K <br />$1.3M - $1.5M <br />$1.36M - $1.58M <br />$300K - $350K <br />$309K - $366K <br />$1.82M - $2.10M <br />$1.84M - $2.17M <br />$182-$210 <br />$185-$217 <br />Lower <br />Higher <br />Higher <br />Lower <br />No <br />Low to Mid -Range <br />Low to Mid -Range <br />Lower <br />Lower <br />Higher <br />Yes <br />Low to Mid -Range <br />5 <br />