Browse
Search
ORD-2000-137 Construction and Demolition Waste Regulation for Recycling
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-137 Construction and Demolition Waste Regulation for Recycling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 11:04:56 AM
Creation date
4/8/2013 12:22:15 PM
Metadata
Fields
Template:
BOCC
Date
10/17/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
10a
Document Relationships
Agenda - 10-17-2000-10a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 10-17-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Municipalities and UNC adopt ordinance and allow Orange County to enforce. (As <br /> with erosion and sediment control ordinance in municipalities). Seven month"grace" <br /> period begins for separation of regulated recyclable materials at landfill and on regulated <br /> construction and demolition sites in whichever jurisdictions have passed the ordinance. <br /> Engineering and detailed design completed.Bids prepared for any equipment and <br /> facilities necessary. <br /> April 2001: Continue refining administrative policies,procedures and forms. Initiate <br /> formal training and education,on the ordinance for haulers and contractors <br /> BOCC—adopt personnel ordinance amendment adding additional staff if required. <br /> Present FY 2001-02 budget for recycling assuming full implementation of C&D <br /> programs on September 1,2001. <br /> May 2001: Complete administrative policies and procedures, forms;etc.Inspect out-of- <br /> county recycling facilities for certification(should County decide to allow this).Bid <br /> facility construction,if permitting complete.Bid equipment . Continue education and <br /> training. <br /> June 2001: BOCC award construction bid and equipment bids. Continue training and <br /> education. <br /> July 2001: Implement licensing of haulers. Continue training and education.Finalize <br /> coordination with municipalities and UNC. <br /> August 2001: Complete initial licensing of haulers and certification of out-of-county <br /> recycling facilities (if allowed). Complete facilities construction and install equipment. <br /> September 2001: "Grace"period ends. Enforcement begins and facilities begin <br /> operation,if construction complete. Licensing and permits required for building, <br /> demolition and hauling. <br /> March 2002: Assessment report to SWAB and BOCC of ordinance. <br /> Conclusions <br /> Staff recommends that the BOCC review the issues and questions raised in this <br /> memorandum regarding how it wishes to handle the following: <br /> • A. regulation of demolition wastes, <br /> • B. use of out-of-county recycling facilities, <br /> • C. coordination with other governments in Orange County,and UNC, sequencing <br /> of consideration of the ordinance with the municipalities, <br /> • D. education of potentially regulated community, <br /> • E. licensing of haulers, <br /> • F. development of facility and staffing needs, <br /> • G. enforcement of ordinance on MSW waste stream <br /> and <br /> • H. the suggested timetable for implementation. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.