Browse
Search
Agenda - 04-11-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 04-11-2013 - Budget Work Session
>
Agenda - 04-11-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 11:36:28 AM
Creation date
4/5/2013 3:02:05 PM
Metadata
Fields
Template:
BOCC
Date
4/11/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 04-11-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Solid Waste — includes recommended funds of $3.16 million in Year 1 (FY 2013 -14) for <br />construction closure costs associated with the Municipal Solid Waste (MSW) Landfill. The <br />Landfill closes on June 30, 2013, but the construction closure costs will occur during FY 2013- <br />14 due to the delay by the State on approval of the closure plan. Recommended funding for <br />Recycling Operations has changed significantly from the previously approved CIP, with funding <br />based on a plan to move to franchising /privatization of curbside services. <br />Sportsplex — includes funding in Year 2 (FY 2014 -15) for a Mezzanine addition at the pool area <br />to include dedicated member change areas and lockers, workout rooms, and a senior /adult <br />cardio strength center. The operator of the facility has proposed two new projects, which are <br />included in Years 3 and 4. A new building addition is proposed in Year 3 (FY 2015 -16) at a cost <br />of $1,900,000 that would house an indoor turfed field for soccer, lacrosse, senior walking, <br />running, kidsplex functions, and kickball. A second new building addition is proposed in Year 4 <br />(FY 2016 -17 at a cost of $900,000 that would house a regulation sized high school /college <br />basketball court, including bleacher seating. The operator's revenue projections from these <br />new projects would generate enough funds to cover the additional annual debt service needed <br />for these projects. <br />School Projects — Highlights <br />Chapel Hill- Carrboro City Schools — Based on the Schools Adequate Public Facilities Ordinance <br />(SAPFO) most recent November 15, 2012 projections, a new Middle School #5 would be <br />needed in FY 2017 -18, so funds are recommended in Years 2 -5, with most of the construction <br />funds in Year 4 (FY 2016 -17) to accomplish this target opening date. Pay -As- You -Go (PAYG) <br />funds are estimated at a 1.5% annual growth rate and the Lottery Proceeds are held constant <br />throughout the 5 -year CIP period. <br />Orange County Schools — Consistent with the current approved CIP, funds of $3,328,750 are <br />recommended in Year 2 (FY 2014 -15) for the construction of an auxiliary gym at Cedar Ridge <br />High School, as well as recommended funds of $12,282,960 in Year 3 (FY 2015 -16) for the <br />construction of a 20 classroom addition wing to address over capacity issues at Cedar Ridge <br />High School. 1.5% annual growth in PAYG funds and constant Lottery Proceeds are assumed <br />throughout the 5 -year CIP period. <br />Note: Within the School Capital Projects section, there are three summaries provided that <br />reflect: (1) the Recommended projects, (2) the Requested, but Unfunded projects, and (3) the <br />total amount of the Recommended and Unfunded projects. <br />Appendices — Highlights <br />County Debt Service and Debt Capacity — Based on the Manager's recommended funding, the <br />County's annual debt service as a percent of the General Fund budget would remain under <br />15% until FY 2017 -18, when it would reach 15.65 %. <br />Note: An additional summary is provided in the Appendices section, which reflects the debt <br />service percent if all the Recommended and the Requested, but Unfunded projects were <br />included during the FY 2013 -18 CIP period. This would increase the percentage to 16.75% in <br />FY 2016 -17, and to 18.04% in FY 2017 -18. <br />
The URL can be used to link to this page
Your browser does not support the video tag.