Orange County NC Website
11 <br /> 1 Margaret Hauth said they have taken the plan to the next step to fund the design work <br /> 2 and move toward engineer's estimates. She said they have had great support from Orange <br /> 3 County and DOT and the hope is that a lot of the improvements will take place this year. She <br /> 4 said that DOT has advised that Churton is approved to be re-paved, so the sidewalk needs to <br /> 5 be done first. She said the details are included in the Agenda Item (page 5) and the map <br /> 6 (pages 10, 11 and 12). She said that the proposed closing of a lane on East Margaret Lane is <br /> 7 no longer being pursued. <br /> 8 Commissioner Gordon asked for clarification about the section on map page 11, <br /> 9 regarding addition of an access to River Park. <br /> 10 Margaret Hauth said the plan being considered would extend the sidewalk beside the <br /> 11 courthouse down to River Park so that a crosswalk could be put in at Nash and Kolack to <br /> 12 facilitate access. <br /> 13 Commissioner Gordon clarified where the sidewalk would extend and where the <br /> 14 crosswalk would be. <br /> 15 Margaret Hauth said there is a gravel walkway coming out the back of the courthouse <br /> 16 that comes up to Churton Street. <br /> 17 Frank Clifton said this is on the plans with DOT for a crossing at the light in front of <br /> 18 Weaver Street, but there is a grade issue there that will have to be accounted for. He said <br /> 19 some trees may have to be removed to give enough space and allow handicap access. <br /> 20 Commissioner Gordon verified that this is just to cross the street and access the <br /> 21 sidewalk, and she asked about what might be done to access River Park. <br /> 22 Frank Clifton said this will be decided after a design on the crosswalk has been decided. <br /> 23 He said it might just be a pathway. <br /> 24 <br /> 25 4. Update on Waterstone <br /> 26 <br /> 27 Eric Peterson said they do not have any new updates from UNC Hospital about opening <br /> 28 dates. He said the administration should open sometime in 2013 and the hospital has an <br /> 29 estimated opening in 2015. He said there was to be a closing schedule to sell all of the housing <br /> 30 pods in 2012 but it did not go through due to problems with the escrow agreement. The Town <br /> 31 Board chose not to proceed with the special assessment district. Stratford Development came <br /> 32 back to the town board in January to address concerns and reduced the amount of proposed <br /> 33 bonds financed in the special assessment district. He said the town board has requested <br /> 34 reduction on the payback from 20 years to 10 years to save 2 million dollars in interest <br /> 35 payments. He said the town board will meet on Monday and set a public hearing date regarding <br /> 36 next steps and proposed assessment roles. After this, the Town Board will approve an <br /> 37 application to the local government commission. If things go according to schedule, bonds will <br /> 38 be sold in June and the proceeds used to construct the parkway to manage traffic along 86 and <br /> 39 within the development. <br /> 40 Chair Jacobs requested that the Board be sent a copy of the plan and what is happening <br /> 41 at the UNC site. <br /> 42 Margaret Hauth said it is on their website and she can send them the direct link. <br /> 43 <br /> 44 5. Update on Hillsborough Vision 2030 <br /> 45 <br /> 46 Margaret Hauth said they kicked off the Town's Vision 2030 process. She said this was <br /> 47 done to get fresh input, which is being used to create a draft plan. She said this draft will be <br /> 48 released in March to get public input throughout the summer and have a document ready for <br /> 49 formal adoption in early fall. <br /> 50 <br />