Orange County NC Website
10 <br /> 3. Drainage culverts shall be sized and located as required by NCDOT and the <br /> Orange County Erosion Control Officer. <br /> 4. The development shall meet the requirements for stormwater management per <br /> Section IV-13-2-c of the Orange County Subdivision Regulations. Adjacent <br /> properties shall be protected from inundation by surface water. The erosion <br /> control plan for this project includes a temporary sediment structure located at a <br /> point where The Woodlands Development runoff enters the Cox property. <br /> Consideration has been given and will be given to locating a permanent <br /> stormwater detention basin at this location. The need for a permanent <br /> stormwater detention basin cannot now be reasonably determined. That <br /> determination will be made by the Orange County Erosion Control Director, <br /> within one year following NCDOT final approval of the construction of the public <br /> roads in The Woodlands, by evaluating the stormwater quantity and other <br /> pertinent stormwater characteristics during storm events that occur within one <br /> year following NCDOT final road approval. The temporary sediment structure <br /> can be, at the option of the developer, either (1) designed and built in a way that <br /> it will serve as a temporary sediment basin during construction and then <br /> converted to a permanent stormwater detention basin or (2) designed and built <br /> as a temporary sediment basin during construction and then redesigned and <br /> rebuilt as a permanent stormwater detention basin. If the developer chooses the <br /> option of redesigning and rebuilding the basin, a letter of credit or escrow <br /> agreement shall be submitted to secure redesign and reconstruction of the <br /> sediment basin. The method and timing of providing this security shall be the <br /> same as is set out in Section B.1 of this Resolution which section describes <br /> securing road construction. The Homeowners Association documents shall <br /> provide for the perpetual maintenance of the permanent stormwater detention <br /> basin if the Orange County Erosion Control Director determines that there is the <br /> need for one. <br /> E. Parkland <br /> 1. The proposed forty-one-lot subdivision is located within the Bingham Township <br /> District Park. As per the decision of the Department of Recreation and Parks, <br /> cash in the amount of $18,200 ($455/lot) shall be paid to Orange County as <br /> payment in-lieu of parkland dedication. <br /> F. Miscellaneous <br /> 1. The Final Plat shall contain a title block and vicinity map in accordance with <br /> Section V-D-2 Title Block and V-D-3 Vicinity Mae of the Orange County <br /> Subdivision Regulations. <br /> 2. Minimum building setbacks, easements, public (along Nine Gates Road) and <br /> private open space areas (including pedestrian corridors and tree conservation <br /> easements) shall be stated on the plat and in a document describing <br /> development restrictions and requirements to be prepared by Planning Staff and <br /> recorded concurrently with the Final Plat. <br /> 3. Drainage easements shall be provided as required by section D. item 2. outlined <br /> above. <br />