Browse
Search
ORD-2000-134 Orange County Soil Erosion and Sedimentation Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-134 Orange County Soil Erosion and Sedimentation Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2013 12:58:23 PM
Creation date
3/28/2013 4:18:08 PM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8p
Document Relationships
Agenda - 09-05-2000-8p
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 09-05-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Ordinance - Administration <br /> surrounding adjacent property provided a non-conforming <br /> situation is not created on the subject or adjacent parcels. <br /> d) Additional property added to an existing parcel shall be <br /> recombined by deed into one zoning lot prior to issuance <br /> of zoning or building permits. <br /> e) Conformance with the Comprehensive Plan shall not be <br /> mandatory when considering a rezoning/relocation of an <br /> EC-5 District, but shall be evaluated. <br /> Q If a condemnation results in less than or equal amount of <br /> property being taken for public right-of-way than is <br /> specified in the Orange County Comprehensive Plan <br /> (Transportation Element) for typical right of way <br /> dedication, then this section shall not be used. <br /> BUILDING PERMIT PROCESS <br /> g) All impervious watershed limitations shall be met. <br /> h) A twenty- (20) feet width landscaped buffer shall <br /> established along the new right-of-way. Design criteria <br /> shall meet commercial standards. <br /> i) Economic Development District standards shall be used, <br /> where applicable. <br /> j) Access points shall limited to two locations with a <br /> maximum of 26 feet width each and a maximum 30-degree <br /> radius. Driveway permit application shall be submitted <br /> along with zoning permit request. <br /> k) Freestanding monument signs shall be limited to six (6) <br /> feet height and fifty (50) square feet maximum. Only the <br /> portion of a sign for fuel pricing may be internally <br /> illuminated. <br /> 1) All current Environmental Health regulations shall be met. <br /> m) All other applicable development criteria such as parking, <br /> lighting, loading/unloading areas, buffers, etc. shall apply. <br /> SECTION TWO: This ordinance shall become effective upon adoption. <br /> (Signature) (Signature) <br /> Clerk, Board of County Commissioners Chair, Orange County Comm' sioners <br /> Date and Seal <br /> 4 j` '°' I <br /> ,:� <br /> G:lrobertPublicHearingMay00 tEC-5(BOCC—adm) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.