Browse
Search
2000 S Solid Waste - Approval of Food Waste Collection and Composting Contract with Brooks Contracting (2)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Solid Waste - Approval of Food Waste Collection and Composting Contract with Brooks Contracting (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 3:01:43 PM
Creation date
3/28/2013 4:10:10 PM
Metadata
Fields
Template:
BOCC
Date
9/5/2000
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8l
Document Relationships
Agenda - 09-05-2000-8l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 09-05-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
either by sending the collection vehicle back, or by sending someone with a smaller vehicle to <br /> collect the materials. <br /> If Contractor cannot provide service on the scheduled day, Contractor will report non-collection <br /> to County on the day that service is scheduled to be provided. County prefers to be notified at the <br /> time that the inaccessibility is discovered. Knowledge of inaccessibility is important to County <br /> and is useful when dealing with the residents of these areas as they call to report missed <br /> collections. If Contractor cannot notify County at the time that inaccessibility is discovered, <br /> Contractor must notify County(either by telephone,fax,or in person)before 4:30 PM of that <br /> day. If Contractor fails to notify County of areas that are not able to be collected due to <br /> inaccessibility by 4:30 PM of the day the area is scheduled to be serviced,County may levy <br /> penalties equal to$25 per household not collected. Any resultant penalties may be deducted <br /> from the cost of service for the month in which the failure to notify took place. <br /> When County receives a report of a missed collection from a resident of an area that was not <br /> serviced due to inaccessibility,County will instruct the resident to leave their recyclable <br /> materials at the curbside and to expect collection either later during their scheduled service day <br /> or no later than 5:00 PM of the next working day(assuming that the roadway is no longer <br /> inaccessible). <br /> Contractor will provide collection of an area not serviced due to inaccessibility by 5:00 PM of the <br /> next working day. In the case of ongoing construction or blockage,recycling collection may be <br /> cancelled,and in this case residents will be notified by County that curbside recycling must be <br /> suspended until construction is complete or the cause of the inaccessibility is removed. <br /> SECTION 14 <br /> Processing Center <br /> Contractor may maintain a Processing Center at its facilities located in the City of Durham,the City <br /> of Raleigh or at other locations. All Recyclable Materials collected from residents may be <br /> processed at the Processing Center: Title to Recyclable Materials brought to the Processing Center <br /> shall be with Contractor and they shall have the responsibility for the sale of such Recyclable <br /> Materials. Storage of Recyclable Materials at the Processing Center shall be limited to that which <br /> can be properly contained pursuant to permits issued by the responsible jurisdiction. Contractor <br /> shall notify County Representatives,in writing,not less than thirty(30)days prior to any relocation <br /> of the Processing or Drop-Off Center. <br /> If County elects to build its own recycling processing center during the term of this contract,or to <br /> divert the materials collected under this contract to any other existing facility,the materials <br /> collected in this program may be directed to that processing center and become property of County <br /> at County's discretion. Any changes in net revenue to the Contractor as a result of this change in <br /> destination and ownership of recyclable materials,or as a result of the need for the Contractor to <br /> make equipment modifications,shall be negotiated between the Contractor and County. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.