Orange County NC Website
SECTION 10 <br /> Transportation of Recyclable Materials and Nan-recyclable Materials <br /> Contractor shall transport the collected Recyclable Materials to its Processing Site(s). Contractor <br /> shall take title to the Recyclable Materials upon placement in the Recycling Container by residents <br /> and shall be responsible for the sale of such recyclable materials and all of the proceeds of the sales. <br /> Recyclable Materials shall be property of Contractor. <br /> No uncontaminated recyclable materials collected in this program shall be landfilled. Landfilling <br /> or incinerating recyclables shall result in a penalty of$250 per incident of unauthorized disposal to <br /> a landfill or incinerator. <br /> County has arrangements with the Town of Chapel Hill to provide a loading dock and temporary <br /> storage at the Town of Chapel Hill Public Works Facility located at 1049 Airport Road. Contractor <br /> may,with explicit perrnission of County and the Town of Chapel Hill,make use of this facility in a <br /> manner cooperative with other users. Contractor,along with other site users,shall be responsible <br /> for keeping this area clean,safe and free of blowing trash or debris from its operation. No more <br /> than eight roll-off containers for the storage of recyclable materials belonging to Contractor shall <br /> accumulate at this site. If more than eight containers accumulate,County or the Town of Chapel <br /> Hill may remove the containers at the expense of Waste Industries after 24 hours written or faxed <br /> notice to Contractor. <br /> Contractor may be asked to occasionally provide County continuous access(defined below)to the <br /> roll-off containers used to collect and temporarily store recyclable materials at the loading dock <br /> facility located at 1099 Airport Road. When and if deemed necessary County may use said roll-off <br /> containers to deposit recyclables collected by its commercial recycling program. Contractor shall <br /> take possession of and title to said materials at the time said materials are deposited into the roll-off <br /> containers by County. Contractor shall enjoy any revenue gained from the marketing of said <br /> materials. <br /> Continuous access to the roll-off containers shall be defined as the containers being placed in a <br /> position that allows County employees access to said containers from the elevated loading dock, <br /> enabling materials to be dumped into said roll-off containers from above. Contractor will cooperate <br /> with County and make sure that the needed roll-off containers are placed such a fashion as to allow <br /> County employees and County collection vehicles access to said containers from 7 AM until 5 PM <br /> daily. Contractor will keep these roil-off containers in such condition as to ensure that they have <br /> capacity to accept the materials generated by County. Contractor will be allowed two(2)hours to <br /> remove said containers for transporting the contents to market. If said roll-off containers are not in <br /> the specified position or do not have capacity to accept materials from County,then County may <br /> levy penalties equal to$25 per hour for each hour between 7 AM and 5 PM that the roll-off <br /> containers are either not in the specified position or do not have capacity to accept materials <br /> generated by County(two(2)hour grace period excepted). Any resultant penalties may be <br /> deducted from the cost of service for this contract for the month in which the event took place. <br /> County will document any event resulting in penalties being levied and will notify Contractor's <br /> representative by telephone at the time that fines begin accumulating. <br /> Failure to clean the temporary storage site within two(2)working days of written or faxed = <br /> notification by County may result in County hiring a service to clean the area with the costs of the <br /> service to be deducted from the following month's invoice. Cost of cleaning service shall not <br /> exceed$250.00 without due notification of Contractor. <br /> Contractor will assist County with costs for any necessary repairs or improvements to the concrete <br /> pads and/or drainage systems that have been built at the temporary loading dock. Estimated costs <br /> 6 <br />