Orange County NC Website
Administration Resolution 7 <br /> a 2-inch caliper measured 6" from ground level at time of planting and planted on <br /> eight(8) foot centers with proper mulch. <br /> The County Engineer shall approve the pump station system design, which shall <br /> include automatically switched standby/emergency power generation, alarm <br /> telemetry, and other materials and equipment necessary for the proper operation <br /> of the system. The County Engineer's approval of system design and layout shall <br /> be obtained prior to the submission of the plans to NCDOT for right-of-way <br /> encroachment approval. The County Engineer's approval of system design, <br /> layout,materials, etc.,shall be obtained prior to submission of plans to state <br /> regulatory agencies for system permitting. All design changes necessary to <br /> comply with NCDOT or other regulatory agency requirements shall be cleared by <br /> the County Engineer prior to incorporation in final design documents. A letter <br /> from the County Engineer indicating approval shall be submitted at the time that <br /> Planning Department signatures are requested on the Final Plat. <br /> O—wnerLapglicant shall set up a 12=etual maintenance fun d to provide for periodic <br /> inspection and required maintenance of the pump station, fencing and <br /> landscaping, Documentation forms to be approved by the County Attorney. <br /> 5. Water line construction drawings shall be submitted to and approved by the Orange-- <br /> Alamance Water System,Inc. A letter indicating approval of the construction <br /> drawings shall be submitted to the Planning Department and shall include copies of <br /> all necessary State and local approvals. A copy of the State permit approval to <br /> construct the system shall be submitted at the same time as the request to record the <br /> final plat.A letter from the Orange-Alamance Water System,Inc. indicating that the <br /> construction of the water lines meets its specifications will be required prior to <br /> Planning Department signatures on the Final Plat. <br /> Prior to Final Plat approval, stub out lines shall be provided and constructed for <br /> each lot. Prior to Final Plat approval, the main water service lines shall be <br /> constructed and stubbed to the adjacent property line to the east. <br /> OR <br /> A letter of credit or escrow agreement or other security shall be submitted to <br /> secure construction of the water system with hydrants to Orange-Alamance <br /> system standards. An estimate of the construction cost must be prepared by a <br /> certified/licensed engineer and submitted to the Orange County Planning <br /> Department. The financial guarantee must reflect 110 percent of that estimate and <br /> be issued by an accredited financial institution licensed to do business in North <br /> Carolina. <br /> The document describing development restrictions to be recorded with the Final <br /> Plat shall state that the financial guarantee will not be released until the water <br /> system and hydrant construction has been inspected and approved by Orange – <br /> Alamance Water System,Inc. and the Orange County Fire Marshal. <br /> 6. All fire hydrant locations, fire flow and water line pressures shall be approved by <br /> the Orange County Fire Marshal prior to issuance of the first certificate of <br /> occupancy. <br />