Browse
Search
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 3:15:17 PM
Creation date
3/26/2013 11:41:11 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 08-15-2000-8m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 08-15-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Exempt Allowable Allowable Prlohibited <br /> with <br /> Mitigation <br /> Underground electric utility line perpendicular crossings of <br /> streams and other surface waters subject to this Rule:. <br /> • Perpendicular crossings that disturb less than or equal to X <br /> 40 linear feet of riparian buffer31 <br /> • Perpendicular crossings that disturb greater than 40 }{ <br /> linear feet of riparian buffer3 a <br /> Provided that,in Zone 1,all of the following BMPs for underground utility lines are used. If all of thesle <br /> BMPs are not used,then the underground utility line shall require a no practical alternative evaluation by <br /> the Division. <br /> • Woody vegetation shall be cleared by hand. No land grubbing or grading is allowed. <br /> • Vegetative root systems shall be left intact to maintain the integrity of the soil. Stumps shall remain, <br /> except in the trench,where trees are cut. <br /> • Underground cables shall be installed by vibratory plow or trenching. <br /> • The trench shall be backfilled with the excavated soil material immediately following cable installation, <br /> i <br /> • No fertilizer shall be used other than a one-time application to re-establish vegetation. <br /> • Construction activities shall minimize the removal of woody vegetation,the extent of the disturbed area, <br /> and the time in which areas remain in a disturbed state. <br /> • Active measures shall be taken after construction and during routine maintenance to ensure diffuse floe <br /> of stormwater through the buffer. <br /> • In wetlands,mats shall be utilized to minimize soil disturbance. <br /> I <br /> I <br /> III, <br /> �I <br /> II <br /> II <br /> i <br /> . III <br /> I <br /> II <br /> I <br /> �6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.