Orange County NC Website
Exempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br /> Temporary roads: <br /> * Temporary roads that disturb less than or equal to 2,500 X <br /> square feet provided that vegetation is restored within six <br /> months of initial disturbance <br /> • Temporary roads that disturb greater than 2,500 square X <br /> feet provided that vegetation is restored within six months <br /> of initial disturbance <br /> X <br /> • Temporary roads used for bridge construction or <br /> replacement provided that restoration activities,such as <br /> soil stabilization and revegetation,are conducted <br /> immediately after construction <br /> Temporary sediment and erosion control devices: <br /> • In Zone 2 only provided that the vegetation in Zone 1 is X <br /> not compromised and that discharge is released as <br /> diffuse flow in accordance with Section 3.0 <br /> • In Zones 1 and 2 to control impacts associated with X <br /> uses approved by the Division or that have received a <br /> variance provided that sediment and erosion control <br /> for upland areas is addressed to the maximum extent <br /> practical outside the buffer <br /> • In-stream temporary erosion and sediment control X <br /> measures for work within a stream channel <br /> Underground electric utility lines: <br /> • Impacts other than perpendicular crossings in Zone 2 X <br /> only 3 <br /> • Impacts other than perpendicular crossings in Zone 13.4 X <br /> 15 <br />