Browse
Search
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 3:15:17 PM
Creation date
3/26/2013 11:41:11 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 08-15-2000-8m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 08-15-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br /> Temporary roads: <br /> * Temporary roads that disturb less than or equal to 2,500 X <br /> square feet provided that vegetation is restored within six <br /> months of initial disturbance <br /> • Temporary roads that disturb greater than 2,500 square X <br /> feet provided that vegetation is restored within six months <br /> of initial disturbance <br /> X <br /> • Temporary roads used for bridge construction or <br /> replacement provided that restoration activities,such as <br /> soil stabilization and revegetation,are conducted <br /> immediately after construction <br /> Temporary sediment and erosion control devices: <br /> • In Zone 2 only provided that the vegetation in Zone 1 is X <br /> not compromised and that discharge is released as <br /> diffuse flow in accordance with Section 3.0 <br /> • In Zones 1 and 2 to control impacts associated with X <br /> uses approved by the Division or that have received a <br /> variance provided that sediment and erosion control <br /> for upland areas is addressed to the maximum extent <br /> practical outside the buffer <br /> • In-stream temporary erosion and sediment control X <br /> measures for work within a stream channel <br /> Underground electric utility lines: <br /> • Impacts other than perpendicular crossings in Zone 2 X <br /> only 3 <br /> • Impacts other than perpendicular crossings in Zone 13.4 X <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.