Browse
Search
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 3:15:17 PM
Creation date
3/26/2013 11:41:11 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 08-15-2000-8m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 08-15-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Exempt Allowable Allowable Pjrohibited <br /> with <br /> Mitigation <br /> Overhead electric utility lines: <br /> • Impacts other than perpendicular crossings in Zone 2 X <br /> Only3 <br /> • Impacts other than perpendicular crossings in Zone 1 "2-3 X <br /> • Perpendicular crossings that disturb equal to or less than X <br /> 150 linear feet of riparian buffer' <br /> • Perpendicular crossings that disturb greater than 150 X <br /> linear feet of riparian buffer' Z <br /> �I <br /> Periodic maintenance of modified natural streams such as <br /> canals and a grassed travelway on one side of the surface X <br /> water when alternative forms of maintenance access are not <br /> practical <br /> Provided that,in Zone 1,all of the following BMPs for overhead utility lines are used. If all of these BMPs are not <br /> used,then the overhead utility lines shall require a no practical alternative evaluation by the Division. <br /> • A minimum zone of 10 feet wide immediately adjacent to the water body shall be managed such that only vegetation <br /> that poses a hazard or has the potential to grow tall enough to interfere with the line is removed. <br /> • Woody vegetation shall be cleared by hand. No land grubbing or grading is allowed. <br /> • Vegetative root systems shall be left intact to maintain the integrity of the soil. Stumps shall remain where trees are <br /> cut. <br /> • Rip rap shall not be used unless it is necessary to stabilize a tower. <br /> • No fertilizer shall be used other than a one-time application to re-establish vegetation. <br /> • Construction activities shall minimize the removal of woody vegetation,the extent of the'disturbed area,and the time <br /> in which areas remain in a disturbed state. <br /> • Active measures shall be taken after construction and during routine maintenance to ensure diffuse flow of <br /> stormwater through the buffer. <br /> • In wetlands,mats shall be utilized to minimize soil disturbance. <br /> 2 Provided that poles or towers shall not be installed within 10 feet of a water body unless the Division completes a nq <br /> practical alternative evaluation. <br /> 3 Perpendicular crossings are those that intersect the surface water at an angle between 75°and 105°. <br /> II! <br /> �2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.