Browse
Search
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2000
>
ORD-2000-129 Orange County Neuse River Basin Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2015 3:15:17 PM
Creation date
3/26/2013 11:41:11 AM
Metadata
Fields
Template:
BOCC
Date
8/15/2000
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8m
Document Relationships
Agenda - 08-15-2000-8m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 08-15-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exempt Allowable Allowable Prohibited <br /> with <br /> Mitigation <br /> Mining activities: <br /> • Mining activities that are covered by the Mining Act X <br /> provided that new riparian buffers that meet the <br /> requirements of Sections 3.13 and 3.0 are established <br /> adjacent to the relocated channels <br /> * Mining activities that are not covered by the Mining Act X <br /> OR where new riparian buffers that meet the requirements <br /> or Sections 3.13 and 3.0 are not established adjacent to the <br /> relocated channels <br /> Non-electric utility lines: <br /> • Impacts other than perpendicular crossings in Zone 2 X <br /> only' X <br /> • Impacts other than perpendicular crossings in Zone 13 <br /> Non-electric utility line perpendicular crossings of streams <br /> and other surface waters subject to this Rule 3: <br /> • Perpendicular crossings that disturb equal to or less than 40 <br /> linear feet of riparian buffer with a maintenance corridor equal X <br /> to or less than 10 feet in width <br /> • Perpendicular crossings that disturb equal to or less than 40 <br /> linear feet of riparian buffer with a maintenance corridor X <br /> greater than 10 feet in width <br /> • Perpendicular crossings that disturb greater than 40 linear <br /> feet but equal to or less than 150 linear feet of riparian buffer X <br /> with a maintenance corridor equal to or less than 10 feet in <br /> width <br /> * Perpendicular crossings that disturb greater than 40 linear <br /> feet but equal to or less than 150 linear feet of riparian buffer X <br /> with a maintenance corridor greater than 10 feet in width <br /> • Perpendicular crossings that disturb greater than 150 linear <br /> feet of riparian buffer X <br /> On-site sanitary sewage systems-new ones that use ground X <br /> absorption <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.