Orange County NC Website
g_js 8 b ,,��F <br /> 5 <br /> Resolution of the Orange County Board of Commissioners <br /> Adopting Prioritization Plan For <br /> Voluntary Acquisition Activities <br /> Through the Hazard Mitigation Grant Program (HMGP) <br /> For the County of Orange, North Carolina <br /> WHEREAS, the County of Orange intends to obtain HMGP funds in order to conduct a <br /> voluntary property acquisition program to remove residential properties from the threat of future <br /> flooding that endangers life and property; and <br /> WHEREAS, the Robert T. Stafford Disaster Relief and Emergency Assistance Act requires that <br /> each HMGP project be cost-effective; and <br /> WHEREAS, it is the finding of the State of North Carolina and the County of Orange that <br /> eliminating exposure to the risk of future flooding is directly related to the cost-effectiveness; <br /> NOW THEREFORE be it resolved by the Board of Commissioners of the County of Orange that <br /> the following methodology be established to prioritize purchasing of residential property from <br /> owners who have expressed an interest in participation in the proposed voluntary acquisition <br /> program and have been included in the HMGP Application for the County of Orange. <br /> METHODOLOGY <br /> Chronology of purchasing property will be based upon an evaluation of the depth of <br /> flooding due to Hurricane Floyd and individual damage surveys for each of the <br /> properties. <br /> Should methodology result in a tie, the following criteria developed from available survey <br /> and any other information will be used to decide upon prioritization of property <br /> purchases: <br /> Located in the Floodway 15 Points <br /> Owner Occupied 5 Points <br /> Wood Frame (includes brick veneer) construction 10 Points <br /> Solid masonry construction 5 Points <br /> Structure built prior to 1982 10 Points <br /> Flood insurance held at time of flooding 5 Points <br /> Special health needs (e.g.: elderly or handicapped) 5 Points <br /> Acquisition offers will be made in chronological and numerical order based upon the <br /> above criteria and priority ranking. <br /> Owner occupied structures will have thirty (30) days to accept or reject a final offer. If a <br /> property owner fails to accept an offer after the cut-off period, funds will no longer be <br /> reserved for the acquisition request and the offer to purchase will be invalid. Offers will <br /> be made to property owners whose properties were included in the grant program until <br /> all available funds are exhausted. <br />