Browse
Search
2013-084 Planning - Legacy Research Associates survey of Buckhorn Mebane Phase 2 Utility corridor $25,100
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-084 Planning - Legacy Research Associates survey of Buckhorn Mebane Phase 2 Utility corridor $25,100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:13:40 PM
Creation date
3/25/2013 12:53:05 PM
Metadata
Fields
Template:
BOCC
Date
3/25/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-084 Planning - Legacy Research Associates $25,100 for Survey of Buckhorn Mebane Phase 2 Utility Corridor
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In general, the majority of archaeological sites that are deemed significant and typically eligible <br /> for inclusion on the NRHP will fall under the last criterion (d). |n order tm assess asite's <br /> significance, its potential for contributing new mrcollaborative information to the t����etica| <br /> and substantive knovv|edgeof archaeology nmustbe determnined (8ut|er]907; Tovxnaen� etal. <br /> l99]). Consequently, researchers must consider how each site helps address the questions <br /> within the project research design and within the framework mfother regional research (Butler <br /> 79Q7)' <br /> The potential of any archaeological site to address research questions is based on determining <br /> the intactness of cultural deposits (integrity), the variety and quantity of artifacts, the clarity of <br /> site stratigraphy and the discreteness of site boundaries, and on the environmental context of <br /> each site (G>asomvxl977)' |m addition, the relative occurrence wf cultural assemblages inthe <br /> region was taken into account during site evaluation to help address issues mf rarity and <br /> redundancy(Butler l987; G|assovx1977)' <br /> G. REPORTING <br /> Upon completion mfthe fieldwork, a management summary mf the results of the investigation <br /> will be pnepaced' This management summary will describe the preliminary interpretations and <br /> the course of analysis, certifying that the research design set forth has been implemented and <br /> that the fieldwork specified has been completed. The management summary will include a <br /> description of the survey, a summary of results, and recommendations. The management <br /> summary will be delivered to Orange County within 15 working days after the completion of <br /> fieldwork via email. <br /> Following completion of analyses, a report will be prepared detailing the results of the field <br /> investigation. The report will detail the results of the background research, fieldwork, and <br /> laboratory analysis. The report will be illustrated with photographs and drawings of sites and <br /> artifacts, as needed, and will conform to the reporting standards presented in the OSA <br /> guidelines. In addition to the report, archaeological site forms will be completed for each <br /> recorded site arisolated find' <br /> The report will include the fm||ovvimg key elements: results of bachonmmmd research, <br /> archaeological site significance assessment and NRHP recommendations, scale mapping an <br /> |ocatimna| iufmrmnatiom; and additional work recommendations, ifany. <br /> H. DELIVERABLES <br /> Deliverables under this contract will include the following. <br /> • Dated management summary reporting the results of the intensive survey and <br /> evauation investigations delivered via email. <br /> • Two initial copies of the draft reports on the intensive survey and evaluation <br /> investigations for Orange County review with completed North Carolina <br /> Archaeological Site Forms. <br /> • Four copies of the final report mn medium-weight bond paper, bound mr <br /> staples, after all review comments have been addressed. <br /> 1. SCHEDULE <br /> Legacy will proceed with this project in an expeditious manner once the Notice to Proceed (NTP) <br /> is received. Fieldwork will be completed with two weeks after NTP. The management <br /> summaries will be submitted within 15 days of the completion of fieldwork. The draft final <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.