Orange County NC Website
Back-up Costs <br /> Line item Description (Subs/Material) Bishop Costs/Labor Mark-up Mark-up% Bishop Total <br /> 1 Geotextile Fabric Attachment <br /> $8,904.60 $0.00 $1,070.40 0.12 $9,975.00 John H Wilson Invoice <br /> 2 Soil Under Cut $1,003.00 $0.00 $0.00 0.00 <br /> $1,003.00 TerraCon Report#70121071.0042 Unit Cost Item <br /> Collins Roof&Gutter 1,100-Reliant Paint 540-Bishop <br /> 3 Storage Building Repair $1,640.00 <br /> $185.00 $167.00 0.10 $1,992.00 Labor and Material 185-WL.Bishop Note Sheet <br /> 4 Concrete Pads W L Bishop Note Sheet,Email to Jerry Smith on rebar, <br /> $9,117.00 $4,991.00 $0.00 0.00 $12,170.00 includes credit or 1938 for asphalt <br /> 5 White Goads Building $420.00 $312.00 $0.00 0.00 <br /> $732.00 W L Bishop Note Sheet,threshold print out <br /> I <br /> I <br />