Browse
Search
2013-085 Solid Waste - W L Bishop Construction Inc for CO4 Geo-Tech fabric $25,872
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-085 Solid Waste - W L Bishop Construction Inc for CO4 Geo-Tech fabric $25,872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 11:44:31 AM
Creation date
3/21/2013 11:41:50 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2013
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Mgr Signed
Document Relationships
R 2013-083 Health - Appalachian District Health Department
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S a 1 s d LJ c'-3-L <br /> Change Order No. 4 <br /> Projeci Name: Walnut Grove Convantence Center HDR Project No. 360207-142838-018 <br /> Expansion <br /> Project Owner: Orange County Owner's Project No.: <br /> Data of Issuance: March 15,2013 <br /> Project Contractor: Date of Contract: August 21,2012 <br /> W.L.Bishop Con3tntction Co. Original Contract Price: $887,092.00 <br /> 2211 Leah Drive Original Contract Period: 120 days <br /> Hdlshorou h.NC 21278 <br /> It is agreed to modify the Contract referred to above ae follow*: <br /> Hera No. ltsm and Deacription of Changes Contract Price contract Time <br /> Dooroasa Increase Dacreus Increase <br /> i Place Goo Fabric under stone base on circle road 38,976.00 NIA MIA <br /> 2 Sops undercut based on Terra Con's report dated 121201112 _ Si,003.00 _ NIA NIA <br /> 3 <br /> Repaint exterior and replace roof on storage building 51,992.00 NIA - NIA <br /> 4 Add concrete ode at compactor areas-4 total _ $12,170.00 N/A NIA <br /> b Add thresholds and utter to White Goods Building w $732.00 N/A WA <br /> Sub-Total $26,872.00 <br /> Difference Net S26,872.00 <br /> Summary: It is agreed to modify the Contract referred to above as follows: <br /> Contract Price prior to this Change Order Contract Time prior to this Change Order 1 <br /> J$951,928.00 1 120 Days i <br /> Not Contract Price increase(Decrease)of this Change Order Net Contract Time Increase(Decrease)of this Change-e--Order <br /> $25.872.00 1 NIA I <br /> Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders JJJ <br /> 1$877,800.00 NIA <br /> The changes Included In this Change Order are to be accomplished in accordance with the terms,stipulations and <br /> conditions o the original t; bract al.ihesrgh included therein. <br /> 2-4s /3 <br /> �ccepted Contfact<3 y Date <br /> comniended for Approval F�pR Enron g.Inc of the Carolinas) Onto <br /> f <br /> Approved tot Owi inf b . Attest Dato <br /> Distribution IX Owner 1X 1Contractor �X Office (Field Other <br /> (�„j j t i CNANGORD DOG <br />
The URL can be used to link to this page
Your browser does not support the video tag.