Browse
Search
2013-079 AMS - Baker Roofing for Sportsplex Pool Roofing System $184,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-079 AMS - Baker Roofing for Sportsplex Pool Roofing System $184,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2013 11:18:44 AM
Creation date
3/18/2013 11:18:43 AM
Metadata
Fields
Template:
BOCC
Date
3/14/2013
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Mgr Signed
Document Relationships
R 2013-079 AMS - Baker Roofing Replacement Sportsplex Pool Roof $184,530
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[Departmental Use Only] <br /> TITLE Sportsplex Pool Roof <br /> FY 12-13 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$1,000,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 25th day of <br /> March, 2013, by and between Baker Roofing Company, (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings and Written Specifications. The Contract Documents form the Contract and are fully <br /> incorporated herein. In the event of any inconsistency between or among the Contract Documents the <br /> Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work required by <br /> this Agreement within the time period stipulated in a written Notice-to-Proceed to be executed by the <br /> Contractor and Owner and in accordance with the following enumerated documents, which are made a part <br /> hereof as if fully contained herein: <br /> a. Construction Drawings prepared by 5th Wall Building Diagnostics(Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. Roof Replacement - Traingle Sportsplex Swimming Pool, Hillsborough NC proposal dated <br /> November 16, 2012, with allowance and pricing deducts described in the letter dated xxx from <br /> 5th Wall Building Diagnostics which fully describes the work to be performed, such work <br /> (hereinafter called the "Work"). <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.