Browse
Search
Agenda - 03-19-2013 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-19-2013 - Regular Mtg.
>
Agenda - 03-19-2013 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 11:13:53 AM
Creation date
3/15/2013 10:19:24 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 03-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />ACCESS <br />1128 Hillsborough <br />401 Fidelity <br />TOC COMMENTS: 1.18 miles from downtown <br />TOC COMMENTS: 0.36 miles from downtown <br />Carrboro, approximately 35 minutes walk time. <br />Carrboro, approximately 10 minute walk time. <br />Sidewalks and bile lanes existing and connect the <br />Sidewalks and bile lanes existing and connect the <br />Accessibility for Pedestrians <br />property to downtown. <br />property to downtown. <br />TOC COMMENTS: Access would be from Fidelity <br />Street. Site could be served by individual access <br />road or connection to existing access to <br />TOC COMMENTS: Access would be from <br />Westwood Cemetery. OC <br />Hillsborough Road. Site could be served by <br />STAFF ADDITIONAL COMMENT: Existing streets <br />individual access road or connection to MLK Park <br />become congested on weekends in support of the <br />Accessibility for Vehicles <br />property. <br />nearby farmers market. <br />TOC COMMENTS: CHT stop for F Route located at <br />TOC COMMENTS: CHT stop for CW route located <br />Accessibility for public transportation <br />Dove /Hillsborough and James /Quail Roost <br />David /Fidelity Street <br />Design capacity and existing traffic load of <br />TOC COMMENTS: Design capacity= 12,000 1day; <br />roadway proposed to access site <br />12011 AADT = 6,500 <br />TOC COMMENTS: Design capacity= 12,000 1day <br />
The URL can be used to link to this page
Your browser does not support the video tag.