Orange County NC Website
13 <br />power outlets, distribution, equipment and connections; and adequate telephone or other communication <br />lines (including modem access and adequate interfacing networking capabilities), all for the installation, <br />use and maintenance of the System. Before installing the Equipment or Software at a work site, Motorola <br />may inspect the work site and advise Customer of any apparent deficiencies or non - conformities with the <br />requirements of this Section. This Agreement is predicated upon normal soil conditions as defined by the <br />version of E.I.A. standard RS -222 in effect on the Effective Date. <br />6.3. SITE ISSUES. If a Party determines that the sites identified in the Technical and Implementation <br />Documents are no longer available or desired, or if subsurface, structural, adverse environmental or <br />latent conditions at any site differ from those indicated in the Technical and Implementation Documents, <br />the Parties will promptly investigate the conditions and will select replacement sites or adjust the <br />installation plans and specifications as necessary. If change in sites or adjustment to the installation <br />plans and specifications causes a change in the cost or time to perform, the Parties will equitably amend <br />the Contract Price, Performance Schedule, or both, by a change order. <br />Section 7 TRAINING <br />Any training to be provided by Motorola to Customer will be described in the Statement of Work. <br />Customer will notify Motorola immediately if a date change for a scheduled training program is required. <br />If Motorola incurs additional costs because Customer reschedules a training program less than thirty (30) <br />days before its scheduled start date, Motorola may recover these additional costs. <br />Section 8 SYSTEM ACCEPTANCE <br />8.1. COMMENCEMENT OF ACCEPTANCE TESTING. Motorola will provide to Customer at least ten <br />(10) days notice before the Acceptance Tests commence. System testing will occur only in accordance <br />with the Acceptance Test Plan. <br />8.2. SYSTEM ACCEPTANCE. System Acceptance will occur upon successful completion of the <br />Acceptance Tests. Upon System Acceptance, the Parties will memorialize this event by promptly <br />executing a System Acceptance Certificate. If the Acceptance Test Plan includes separate tests for <br />individual Subsystems or phases of the System, acceptance of the individual Subsystem or phase will <br />occur upon the successful completion of the Acceptance Tests for the Subsystem or phase, and the <br />Parties will promptly execute an acceptance certificate for the Subsystem or phase. If Customer believes <br />the System has failed the completed Acceptance Tests, Customer will provide to Motorola a written notice <br />that includes the specific details of the failure. If Customer does not provide to Motorola a failure notice <br />within thirty (30) days after completion of the Acceptance Tests, System Acceptance will be deemed to <br />have occurred as of the completion of the Acceptance Tests. Minor omissions or variances in the System <br />that do not materially impair the operation of the System as a whole will not postpone System Acceptance <br />or Subsystem acceptance, but will be corrected according to a mutually agreed schedule. <br />8.3. BENEFICIAL USE. Customer acknowledges that Motorola's ability to perform its implementation <br />and testing responsibilities may be impeded if Customer begins using the System before System <br />Acceptance. Therefore, Customer will not commence Beneficial Use before System Acceptance without <br />Motorola's prior written authorization, which will not be unreasonably withheld. Motorola is not <br />responsible for System performance deficiencies that occur during unauthorized Beneficial Use. Upon <br />commencement of Beneficial Use, Customer assumes responsibility for the use and operation of the <br />System. <br />8.4 FINAL PROJECT ACCEPTANCE. Final Project Acceptance will occur after System Acceptance <br />when all deliverables and other work have been completed. When Final Project Acceptance occurs, the <br />parties will promptly memorialize this final event by so indicating on the System Acceptance Certificate. <br />Section 9 REPRESENTATIONS AND WARRANTIES <br />9.1. SYSTEM FUNCTIONALITY. Motorola represents that the System will perform in accordance <br />with the Specifications in all material respects. Upon System Acceptance or Beneficial Use, whichever <br />Motorola.CSA. revision. 10.22.12.doc <br />Motorola Contract No. <br />