Browse
Search
Agenda - 03-19-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-19-2013 - Regular Mtg.
>
Agenda - 03-19-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 11:03:22 AM
Creation date
3/15/2013 9:42:38 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 03-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> 1 Commissioner Pelissier said one of the uses would be for work sessions, and would they <br /> 2 have noise from other events. <br /> 3 Frank Clifton said many of these issues would need to be resolved, such as <br /> 4 soundproofing, windows, etc. <br /> 5 Frank Clifton said the next item is about Link Government Services Center and the <br /> 6 Annex. <br /> 7 Jeff Thompson said the space study has been updated several times and the last one <br /> 8 was in 2009 and the agricultural functions were included in the Revere Road property. He said <br /> 9 the study did not take into consideration the aged building and the $1-1.5 million dollar repair <br /> 10 costs. He said the building costs about $50,000 a year to operate. He said the people in the <br /> 11 building are operating harmoniously and it meets the space study needs. <br /> 12 Architect Ken Redfoot referenced the Annex and showed the floor plans. He said the <br /> 13 Board of Elections is presently in the lower level. He said a simple study was done regarding <br /> 14 how to accommodate as many offices as possible within this foot print. He showed layout of the <br /> 15 offices, conference room, shared reception, and possible kitchen space. He said in the attic <br /> 16 space, with appropriate updates, there is usable space to accommodate five people. He said <br /> 17 that in this plan there are a total of 26 office areas in the lower level as well as the 5 in the upper <br /> 18 level. <br /> 19 Ken Redfoot said the total square footage on first floor is about 6900 sq. ft. <br /> 20 Jeff Thompson said that as comparison, the existing facility, has 10,926 usable square <br /> 21 feet within the current EAC facility. <br /> 22 Chair Jacobs asked if there would be changes to any of the cinderblock wall <br /> 23 configurations. <br /> 24 Ken Redfoot said most of the cinder blocks are non-load bearing and could be <br /> 25 demolished. He said the building is very well built and structurally sound. <br /> 26 Jeff Thompson said there are about$250,000 in HVAC concerns, including equipment <br /> 27 that is below water level in the event of a 100 year flood. He said that if the envelope of the <br /> 28 building is breached, this will trigger flood regulations and town historic regulations; however if <br /> 29 changes are kept within the envelope of the building, it keeps expenses much lower. <br /> 30 Chair Jacobs asked how much parking is associated with building. Frank Clifton said it <br /> 31 is for the full use of this building. Chair Jacobs asked if there would actually be sufficient <br /> 32 parking, even on court days. Frank Clifton said there are crowded times from on Wednesday <br /> 33 morning, but more people are using the parking deck now that it is free. <br /> 34 Commissioner Price said what is the reason for suggesting 26 office spaces in the <br /> 35 annex. <br /> 36 Ken Redfoot said this number came from a combination of the way people might move <br /> 37 between the facilities being discussed and determine if there was an adequate amount of offices <br /> 38 between Whitted, the Annex and the Link building, to accommodate these moves. <br /> 39 Commissioner Price asked why specifically 26 offices were needed in this building and if <br /> 40 they know what departments would move there. <br /> 41 Frank Clifton said they looked at Revere Road and who might move and how <br /> 42 consolidation could be done and how many offices could you have. He said they then work <br /> 43 backward to see if this accommodates everyone. The number given was just the maximum <br /> 44 number of offices. <br /> 45 Commissioner Price asked why re-locate the Board of Elections out of the annex since <br /> 46 they are using all the space. She noted that there are few employees but high number of <br /> 47 volunteers. <br /> 48 Frank Clifton said most of the space is used for storage. He said that they are paying <br /> 49 utilities in two facilities and under-using both. He said the attempt was made to come up with <br /> 50 alternative uses that made sense. <br />
The URL can be used to link to this page
Your browser does not support the video tag.