Browse
Search
Agenda - 03-19-2013 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-19-2013 - Regular Mtg.
>
Agenda - 03-19-2013 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 11:03:22 AM
Creation date
3/15/2013 9:42:38 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 03-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> 1 (919) 707-0946 (919) 707-0941 <br /> 2 selee @ncdot.gov swalston @ncdot.gov <br /> 3 Tom Altieri Matt Day <br /> 4 Comprehensive Planning Supervisor Senior Planner <br /> 5 Orange County Triangle Area RPO <br /> 6 (919) 245-2579 (919) 558-9397 <br /> 7 taltieri @co.orange.nc.us mday @tjcog.org <br /> 8 <br /> 9 More info at www.ncdot.org/-tpb <br /> 10 <br /> 11 Manager Recommendation <br /> 12 1. Receive the draft Comprehensive Transportation Plan. <br /> 13 2. Conduct the public hearing and accept public and BOCC comment on the proposed <br /> 14 Plan. <br /> 15 3. Refer the matter to the OUTBoard with a request that a recommendation be returned to <br /> 16 the BOCC in time for the March 7, 2013 BOCC regular meeting. <br /> 17 4. Adjourn the public hearing until March 7, 2013 in order to receive and accept the <br /> 18 OUTBoard's recommendation and any submitted written comments. <br /> 19 <br /> 20 <br /> 21 In answer to questions about park and ride lots, it was answered that the park and ride <br /> 22 lots are consistent with the bus and rail investment plan. Regarding funding, the CTP does not <br /> 23 address this aspect. It is a long-range vision. <br /> 24 <br /> 25 Commissioner Gordon made reference to page 92 and asked if these were adopted <br /> 26 definitions of facilities. Sarah Lee said that these are standardized definitions that DOT uses. <br /> 27 Commissioner Gordon made reference to page 101 and said that there should be some <br /> 28 kind of"key" for these definitions on this page. <br /> 29 Sarah Lee said that on page 100 it lists out the various abbreviations. <br /> 30 Commissioner Gordon asked what kind of input is needed from the County <br /> 31 Commissioners. <br /> 32 Sarah Lee said that at this point they would like the agreement on the proposals when it <br /> 33 comes back in March. <br /> 34 Commissioner Dorosin asked for an explanation of how the CTP and the transportation <br /> 35 plan for the County would work together. <br /> 36 Tom Altieri said that the Orange County Bus and Rail Investment Plan does address the <br /> 37 entire county. Part of this has to do with the organizational structure of transportation. <br /> 38 Commissioner McKee said that it is important to keep in mind that these various plans <br /> 39 have different funding sources and are controlled by different entities. While they overlap, they <br /> 40 do not necessarily work that close together. He said that they are basically talking about two <br /> 41 very different transportation plans. <br /> 42 <br /> 43 <br /> 44 <br /> 45 PUBLIC COMMENT: <br /> 46 Ed Flowers said that the County Commissioners need to address a current need. He is <br /> 47 a farmer in Hillsborough and he shared some concerns about transportation for the senior <br />
The URL can be used to link to this page
Your browser does not support the video tag.