Orange County NC Website
11 <br /> 1 <br /> 2 Previous Input on Recommendations <br /> 3 • Planning Board, September 2011 <br /> 4 • Public drop-in session, September 2011 <br /> 5 • Public comment website, open through September 26 <br /> 6 • Committee meeting, September 21 <br /> 7 - Reviewed input and finalized draft recommendations for presentation to BOCC in <br /> 8 October 2011 <br /> 9 • Orange County Planning staff review of Technical Report and edits incorporated by <br /> 10 NCDOT staff, December 2012 <br /> 11 <br /> 12 Addressing Input on Recommendations <br /> 13 October 2011 BOCC <br /> 14 • Discussion of county bicycle plan being recreational, and adding more commuter-based <br /> 15 routes, while being mindful of traffic and safety <br /> 16 - Coordination by Orange County staff with draft DCHC MPO 2040 Metropoliton <br /> 17 Transportation Plan (MTP) resulted in minor deletions and additions to CTP <br /> 18 bicycle recommendations <br /> 19 - Verbiage added to Chapter 1 (p. 1-15) of report to reflect combined recreational <br /> 20 and commuting opportunities <br /> 21 • Discussion of park and ride lots regarding traffic analysis and specifics for the lots <br /> 22 - Verbiage added to Chapter 2 (p. 11-6) of report to clarify that specific information <br /> 23 would be developed at a later date, and that the CTP identifies the general areas <br /> 24 of anticipated need <br /> 25 • Verbiage added to report in Chapter 2 (P. 11-1 and 11-3/4) to reflect NCDOT project <br /> 26 implementation process and elaborate on project proposal details with regards to NC 86 <br /> 27 expressway recommendation <br /> 28 <br /> 29 Next Steps <br /> 30 • OUTBoard recommendation in February <br /> 31 • Adoption of 5 maps by Orange County in March <br /> 32 • Endorsement of 5 maps by TARPO <br /> 33 • Adoption of 5 maps by NCDOT <br /> 34 • Technical report review by external contacts <br /> 35 - Orange County, multiple NCDOT contacts, TARPO <br /> 36 • Technical report finalized by NCDOT and distributed <br /> 37 - Consideration of entire report by Orange County if desired <br /> 38 • Thank you! Questions? <br /> 39 Orange County CTP Website: <br /> 40 http://www.ncdot.org/-tpb/planning/orangecounty.html <br /> 41 Sarah E. Lee Scott Walston <br /> 42 Transportation Engineer Triangle Unit Supervisor <br /> 43 NCDOT TPB NCDOT TPB <br />