Orange County NC Website
Administration Resolution 8 <br /> The document describing development restrictions to be recorded with the Final <br /> Plat shall state that the financial guarantee will not be released until the water <br /> system and hydrant construction has been inspected and approved by Orange — <br /> Alamance Water System, Inc. and the Orange County Fire Marshal. <br /> 6. All fire hydrant locations, fire flow and water line pressures shall be approved by <br /> the Orange County Fire Marshal prior to issuance of the first certificate of <br /> occupancy. <br /> 7. Sewer tat), acreage, access, availability, capital facility fees <br /> Sewer fees based on an acreage or a per lot charge shall be paid to Orange County <br /> prior to Planning Department signatures on the final plat. Sewer fees based on <br /> house size shall be paid to Orange County when obtaining individual building <br /> permits. <br /> B. Roads and Access <br /> 1. Alice Miller Court, Midvale Drive, and Boundbrook Drive shall be constructed to <br /> NCDOT standards within a 50-foot right-of-way with 5' utility easements on each <br /> side. Construction shall be inspected and approved by NCDOT. <br /> OR <br /> A letter of credit or escrow agreement or other security shall be submitted to <br /> secure construction of Alice Miller Court, Midvale Drive, and Boundbrook Drive <br /> to NCDOT standards. An estimate of the construction cost must be prepared by a <br /> certified/licensed engineer or grading contractor and submitted to the Orange <br /> County Planning Department. The financial guarantee must reflect 110 percent of <br /> that estimate and be issued by an accredited financial institution licensed to do <br /> business in North Carolina. <br /> The document describing development restrictions to be recorded with the Final <br /> Plat shall state that the financial guarantee will not be released until the road <br /> construction has been inspected and approved by NCDOT. <br /> 2. An erosion control plan for the entire project, including streets, shall be submitted <br /> by the applicant for review and shall be approved by the Orange County Erosion <br /> Control Division prior to any disturbance on the site. The Erosion Control Plan <br /> shall include a stormwater management plan that meets the requirements of both <br /> the County and the Neuse River Basin rules. <br /> 3. Prior to any construction or any alteration of any existing access within the right- <br /> of-way of Richmond Road,the developer/owner shall secure a driveway permit <br /> from the NCDOT-District Office. Submit a copy of the NCDOT- approved <br /> permit and letter to the Planning Department at the same time as the request for <br /> Planning Department signatures on the Final Plat. Sight distance triangles shall <br /> be shown at all intersections within the subdivision,or included within the right- <br />