Browse
Search
2000 S Purchasing - RFP Award of Professional Services for Design of the Whitted and Northern HVAC Systems and the Electrical System Renovation at Court Street
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Purchasing - RFP Award of Professional Services for Design of the Whitted and Northern HVAC Systems and the Electrical System Renovation at Court Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 12:12:33 PM
Creation date
3/13/2013 11:45:31 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8w
Document Relationships
Agenda - 06-29-2000-8w
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 06-29-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installed in the building and is unsightly._This rp oject will include the work necessary to replace and Lipgrade the building electrical <br /> service and to replace the electrical distribution system throughout the building. _ While replacing electrical.power wiring, <br /> communication wiring will also be organized and ungraded._Due to the large amount of solid brick used in the original construction <br /> of the building,we anticipate the use of some replacement base raceway to house both electrical power and communication wiring. <br /> The existing ling is combination of T-12 surface mount and lay-in type fluorescent fixtures._ This rn oject will include the <br /> replacement of these fixtures with more efficient fixtures. <br /> A new addressable fire alarm system will be installed with means to communicate with a central location as directed by Orange <br /> County. A security system will be incorporated into the design of the fire alarm system. <br /> The Owner and Architect agree as follows. <br /> ARTICLE 1.1 INITIAL INFORMATION <br /> 1.1.1 This Agreement is based on the following information and assumptions. <br /> (Note the disposition for the following items by inserting the requested information or a statement such as"not applicable," "unknown at time of execution"or <br /> "to be determined later by mutual agreement.') <br /> 1.1.2 PROJECT PARAMETERS <br /> 1.1.2.1 The objective or use is: <br /> (Identify or describe,if appropriate,proposed use or goals) <br /> Replace the electrical service and distribution communication wiring and li tin of the Orange Co un Court Street Annex, <br /> Hillsborough,NC. A new fire alarm and secppiV system will be installed. <br /> 1.1.2.2 The physical parameters are: <br /> (Identify or describe,if appropriate,size,location,dimensions,or other pertinent information,such as geotechnical reports about the site.) <br /> The project is limited to the property owned by Orange County referred to as the Court Street Annex in Hillsborough,NC. <br /> 1.1.2.3 The Owner's Program is: <br /> (Identify documentation or state the manner in which the program will be developed.) <br /> As defined by the fee letter. <br /> 1.1.2.4 The legal parameters are: <br /> (Identify pertinent legal information,including,if appropriate,land surveys and legal descriptions and restrictions of the site) <br /> 1.1.2.5 The financial parameters are as follows. <br /> .1 Aaie»t of t ie Owner ll get fer ie -eject, ineluding tke Architect's eon pensafioa,4s: The preliminary <br /> estimate of probable construction cost for the work is $164,700.00._The Engineer's lump sum fee, excluding fees <br /> paid overtime excess insurance and printing beyond progress prints and fmal plotting of documents is$15,600.00. <br /> .2 A .of the O-A er-'s budget for-t e Cost of the WeEk_e ,.1 ding the A..ehileet's., ffTe sation <br /> 1.1.2.6 The time parameters are: <br /> (Identify,if appropriate,milestone dates,durations or fast track scheduling.) <br /> The anticipated schedule upon written notice to proceed is as follows: <br /> Combined SD/DD submittal-4 weeks AHJ review and gpproval-4 weeks 95%CD preparation and submittal-2 weeks <br /> AHJ review and approval-4 weeks Incorporated final comments review by AHJ,Advertise/Issue/Receive Bids-6 weeks. <br /> Award Contract-3 weeks Mobilization - 1 week Shop drawing reviews/release of materials-3 weeks,Delivery of materials-8 <br /> weeks Construction - 12 weeks. Substantial completion-47 weeks. Closeout-5 weeks. <br /> 1.1.2.7 The proposed procurement or delivery method for the Project is: <br /> (Identify method such as competitive bid,negotiated contract,or construction management) <br /> Competitive bid. <br /> 1.1.2.8 Other parameters are: <br /> AIA DOCUMENT B141-STANDARD FORM AGREEMENT- 1997 EDITION-AIA-COPYRIGHT 1997-THE AMERICAN INSTITUTE OF ARCHITECTS, <br /> 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.20006-5292.WARNING: Unlicensed photocopying violates U.S.copyright laws and will subject the <br /> violator legal prosecution.This document was electronically produced with permission of the AIA and can be reproduced without violation until the date of expiration <br /> as noted below. <br /> Electronic Format B141-1997 <br /> User Document:40101 --9/18/2001.AIA License Number 119648,which expires on 9/30/2001 --Page#2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.