Browse
Search
2000 S Purchasing - RFP Award of Professional Services for Design of the Whitted and Northern HVAC Systems and the Electrical System Renovation at Court Street
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Purchasing - RFP Award of Professional Services for Design of the Whitted and Northern HVAC Systems and the Electrical System Renovation at Court Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 12:12:33 PM
Creation date
3/13/2013 11:45:31 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8w
Document Relationships
Agenda - 06-29-2000-8w
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 06-29-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> B141 Addendum <br /> This Addendum sets forth the modifications to the AIA B141-Standard <br /> Form of Agreement between Owner and Architect with Standard Form of <br /> Architect's Services (1997 Edition) ("Standard Agreement") dated as of <br /> September 12, 2001, which have been agreed to by the County of Orange, <br /> Owner, and Robson Woese Inc. Where a Paragraph or other portion of the <br /> Standard Agreement has been modified or deleted hereby, the unaltered <br /> provisions of such Paragraph or portion shall continue in effect. To the extent <br /> that there is any conflict between the terms of this Addendum and the Standard <br /> Agreement, the terms of this Addendum shall Control <br /> General. Delete the word "Architect" where it appears on this document and <br /> insert "Engineer' <br /> 1.3.7.9 Add a new Paragraph 1.3.7.10 to read as follows: <br /> "To the fullest extent permitted by law, Owner shall indemnify and hold <br /> harmless Robson Woese Inc. from and against any and all costs, losses <br /> and damages (including but not limited to all fees and charges of <br /> Engineers, Architects, Attorneys, and other professionals, and all cost or <br /> arbitration or other dispute resolutions costs) arising out of or resulting <br /> from a Hazardous Environmental Condition, Sick Building Syndrome and <br /> Building Related Illnesses provided that (1) and such cost, loss, or damage <br /> is attributable to bodily injury, sickness, disease, or death, or to injury or <br /> destruction of tangible property (other than completed Work), including the <br /> loss of use resulting therefrom, and (ii) nothing shall obligate Owner to <br /> indemnify any individual or entity from and against the consequences of <br /> that individual's or entity's own negligence or willful misconduct." <br /> Add a new Paragraph 1.3.7.11 to read as follows: <br /> "The total liability, in the aggregate, of Robson Woese Inc. to OWNER and <br /> anyone claiming by, through, or under OWNER for any and all claims, <br /> losses, costs or damages whatsoever arising out of, resulting from or in <br /> any way related to the Project or this Agreement from any cause or <br /> causes, including but not limited to the negligence professional errors or <br /> omissions, strict liability or breach of contract, or warranty express or <br /> implied, of Robson Woese Inc., shall not exceed the total insurance <br /> proceeds paid on behalf of or to Owner by Robson & Woese, Inc, insurers <br /> in settlement or satisfaction of Owner's claims under the terms and <br /> conditions of Robson Woese Inc. insurance policies applicable thereto." <br />
The URL can be used to link to this page
Your browser does not support the video tag.