Orange County NC Website
5 <br /> OR <br /> A letter of credit, escrow agreement, or bond shall be submitted to secure <br /> construction of Country Air Lane, Butterly Place, Fernleaf Place, Rosebriar <br /> Place and Highbranch Way to the standards of the North Carolina Department <br /> of Transportation. An estimate of the construction cost must be prepared by a <br /> certified/licensed engineer or grading contractor and submitted to the Planning <br /> and Inspections Department. The financial guarantee must reflect 110% of that <br /> estimate and be issued by an accredited financial institution licensed to do <br /> business in North Carolina. <br /> The document describing development restrictions to be recorded with the Final <br /> Plat shall state that the financial guarantee will not be released until the road <br /> construction has been inspected and approved by NCDOT. <br /> 2. All lots shall receive access from the internal subdivision roads. No driveways <br /> shall be permitted within 50,of a street intersection. <br /> 3. An erosion control plan for construction of the roads shall be submitted by the <br /> applicant to the Orange County Erosion Control Division for review and <br /> approval. <br /> 4. Approved street name signs shall be erected at the intersection as required in <br /> Section IV-B-3-c-12 of the Orange County Subdivision Regulations. Evidence <br /> shall be submitted by the applicant that the sign is in place or a copy of the <br /> receipt for purchase of the signs shall be submitted to the Planning Department. <br /> 5. Prior to any construction or alteration of any existing access within the right-of- <br /> way of New Sharon Church Road, the developer/owner shall secure a driveway <br /> permit from the NCDOT District Office. Submit a copy of the NCDOT- <br /> approved permit and letter to the Planning Department at the same time as the <br /> request for Planning Department signatures on the Final Plat. <br /> 6. Sight triangles (10,x 70, ) shall be shown on the Final Plat at each intersection. <br /> 7. A right turn taper lane on New Sharon Church Road at the Country Air Lane <br /> intersection shall be constructed or bonded to NCDOT standards prior to <br /> Planning Department signatures on Final Plat for Phase 2 Section A. A traffic <br /> impact study will be conducted, prior to approval of Phase 2 Section B, by the <br /> developer to determine the need for a center left turn lane. <br /> C. Land Use Buffers and Landscaping <br /> 1. Landscaping shall be installed or preserved as indicated on the approved <br /> landscape plan, and must be inspected and approved by the Planning and <br /> Inspections Department. Landscaping shall be placed behind the sight triangles <br /> at intersections. <br />