Browse
Search
2000 S Solid Waste - Quality Assurance Technical Assistance Contract for Landfill Cell #4 Liner
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Solid Waste - Quality Assurance Technical Assistance Contract for Landfill Cell #4 Liner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 11:15:30 AM
Creation date
3/12/2013 8:34:03 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2000
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8d
Document Relationships
Agenda - 06-06-2000-8d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 06-06-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section IV.3 The QA Role for This Project <br /> PART GENERAL The Quality Assurance (QA) program shall be maintained for all <br /> REQUIREMENTS Soil Liner (SL) construction activities. A Quality Assurance <br /> Officer (QAO) shall be responsible for the implementation of the <br /> quality control program. <br /> The QA program shall consist of all construction and <br /> administrative activities related to the SL to control the overall <br /> quality of the SL. The program shall be implemented by Draper <br /> Aden Associates. See Section 11 of this proposal personnel <br /> resumes. Quality shall be defined as the level of effort, materials, <br /> means or methods used which meet the minimum requirements as <br /> specified in the Project Documents. Administrative items included <br /> in the QC program include project QC submittals, field logs, and <br /> record drawings. <br /> All soils testing shall be performed in-house by our qualified <br /> testing laboratory. The soils testing laboratory has participated in <br /> an inspection program conducted by the National Institute for <br /> Science and Technology or the U.S. Army Corps of Engineers <br /> within the past 2 years. A soils testing laboratory representative <br /> shall be present on site during all construction operations which <br /> require quality control testing or observation as per the project <br /> specifications. <br /> Time schedules for Quality Control testing will closely follow the <br /> Contractor's proposed schedule, and will be adjusted during <br /> construction as per the Contractor's schedule. <br /> The CQA services which Draper Aden Associates will provide <br /> include the performance of QA Engineering, Construction <br /> Management and QC soils testing in accordance with the project <br /> plans and specifications. <br /> kill <br /> In order to improve communication, and provide potential savings <br /> to the Town of Chapel Hill. Draper Aden Associates can provide a <br /> highly qualified QA Officer (QAO) on site M time to provide <br /> both general CM Services and QC soils testing services for the <br /> contractor during the placing of the sod component of the liner <br /> system. Draper Aden Associates' QA Engineer will perform <br /> weekly site visits--with routine attendance at job site meeiiM to <br /> update progress, provide testing clarification and monitor the <br /> performance of the contractor. As part of this scope of work, <br /> Draper Aden Associates construction administration services will <br /> include items such as coordinating job site meetings, processimg of <br />
The URL can be used to link to this page
Your browser does not support the video tag.