Orange County NC Website
4/28/00 <br /> GCL <br /> Grab Strength and Elongation 5 each $ 65.00 $ 325.00 <br /> Permeability 5 each $ 20.00 $ 325.00 <br /> $ 650.00 <br /> 60 mil HDPE <br /> Testing As Per Section 13303, 2.01 5 each $ 5.00 $ 560.00 <br /> $ 560.00 <br /> 60 mil HDPE Destructive Seam Testing <br /> Approximate Based on 22'wide roils <br /> Fusion Weld 55 each $ 35.00 $ 1,925.00 <br /> Extrusion Weld 10 each $ 35.00 $ 350.00 <br /> $ 2,275.00 <br /> Total Conformance Testing Costs $ 14,941.00 <br /> Field Construction/Observation <br /> Baser!on Time schedules noted in the RFP <br /> Soil Liner Placement <br /> Senior Soil Technician 60 hours $ 27.00 $ 1,620.00 <br /> Mileage 800 miles $ 0.32 $ 256.00 <br /> Subtotal Per Week $ 1,876.00 <br /> Total 6 weeks $ 1,876.00 $ 110,256.00 <br /> Protective Cover <br /> Senior Soil Technician 50 hours $ 27.00 $ 1,350.00 <br /> Mileage 800 miles $ 0.32 $ 256.00 <br /> Subtotal Per Week $ 1,606.00 <br /> Total 3 weeks $ 1,606.00 $ 4,818.00 <br /> Leachate Piping <br /> Senior Soil Technician 40 hours $ 27.00 $ 1,080.00 <br /> Mileage 800 miles $ 0.32 $ 256.00 <br /> Subtotal Per Week $ 1,336.00 <br /> Total 3 weeks $ 1,336.00 $ 4,008.00 <br /> Geosynthetic Installation <br /> Senior Soil Technician 60 hours $ 27.00 $ 1,620.00 <br /> Mileage 800 miles $ 0.32 $ 256.00 <br /> Subtotal Per Week $ 1,876.00 <br /> Total 4 weeks $ 1,876 00 $ 7,504.00 <br /> Total Fiel"bservation Costs $ 27,586.00 1 <br /> Orange Regional Landfill, Phase 4 Construction.xls <br /> Proposal <br /> Page 2 <br />