Browse
Search
2000 S Solid Waste - Quality Assurance Technical Assistance Contract for Landfill Cell #4 Liner
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Solid Waste - Quality Assurance Technical Assistance Contract for Landfill Cell #4 Liner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 11:15:30 AM
Creation date
3/12/2013 8:34:03 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2000
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8d
Document Relationships
Agenda - 06-06-2000-8d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 06-06-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tw `tA Section 1VA Quality Control Testing <br /> 4 <br /> w4�` <br /> jThe Quality Control program will include all construction and <br /> administrative activities related to the soil liner to control the overall <br /> quality of the soil liner. Time schedules for Quality Control testing will <br /> closely follow the Contractor's proposed schedule and will be adjusted <br /> during construction as per the Contractor's schedule. <br /> All soils testing will be performed in-house by our qualified testing <br /> laboratory. Inspection of the structural fill, low permeability soil, GCL, <br /> drainage layer, diversion berms, slope drains, rip-rap ditches, access <br /> roadways and seeding and mulching will be performed on a full time <br /> schedule, as required Inspection of erosion control will be performed <br /> throughout the project to ensure compliance with the approved Erosion <br /> and Sediment Control Plan.. <br /> If applicable, material for the borrow study will be sampled from the <br /> borrow site or taken from stockpiles. The borrow source will be <br /> documented and approved by the Engineer prior to use. <br /> Prior to the low permeability soil and GCL placement, the base will be <br /> prepared--smooth,free of surface defects and proof rolled <br /> The Contractor will construct a test pad to determine if the required <br /> permeability can be obtained using the specified compaction equipment <br /> and lift thickness. The test pad will be used to check if the methods used <br /> to reduce clods in the soil (if applicable), interconnect lifts and compact <br /> the soil liner are sufficient to remold the soil and achieve the required <br /> Permeability. <br /> At the completion of phases of the project, Quality Control Reports and <br /> testing will be compiled and certified by the Quality Control Engineer. <br /> The reports will present all test results and test locations;both horizontal <br /> and vertical. <br /> ,s <br /> We will use the services of the following testing laboratory: <br /> Precision GwMrthetic Laboratories <br /> 11817 Watercr+ea"Court <br /> Austin,Texas 78733 <br />
The URL can be used to link to this page
Your browser does not support the video tag.