Browse
Search
Agenda - 03-12-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-12-2013 - Work Session - Late
>
Agenda - 03-12-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:47:55 AM
Creation date
3/8/2013 2:26:44 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 03-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Capital Projects <br />Fiscal Years 2013 -18 <br />Project Name <br />Energy Bank <br />Project Status <br />Approved <br />Functional Service Area <br />Governing and Management <br />Starting Date <br />7/1/2012 <br />Department <br />Asset Management Services <br />Completion Date <br />613012015 <br />Current <br />Year 1 <br />Year 2 Year 3 Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />Fiscal Year <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Proiect Budget <br />Funding 2012 -13 <br />2013 -14 <br />2014 -15 2015 -16 2016 -17 2017 -18 Total <br />Year 10 <br />Land /Building <br />Construction /Repairs /Renovations 50,000 50,000 50,000 100,000 <br />Total Project Budget: 1 50,000 50,000 - - - 100,000 1 - <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs - - - - - - - <br />Revenues /Funding Source <br />Transfer from General Fund 50,000 50,000 50,000 100,000 <br />Total 50,000 50,000 - - - 100,000 - <br />Project Description /Justification <br />Initially funded at $50,000 for FY 12/13, the energy /utility "bank" provides funding for projects that reduce energy /water demand at County facilities. 'Borrowed" funds will <br />be repaid through annual savings /avoided costs from reduced energy /water use. Savings /avoided costs from utility line items in the AMS Facilities operating budget would <br />be used for these repayments. Projects to be completed by the end of FY 12/13 include replacement of high energy use lighting fixtures in the Eno River Parking Deck, <br />acquired by the County in July, 2012, and installation of solar film on windows at select buildings to reduce heat transmission, resulting in lower costs for cooling interior <br />spaces. Potential projects for FY 13 -14 and FY 14 -15 include additional solar film installations, weatherization improvements for older buildings, HVAC controls <br />improvements, solar thermal for water heating and lighting replacements. Projects are continually evaluated as new technologies evolve. Asset Management Services <br />has requested availability of a student intern during calendar year 2013 to research and evaluate energy reduction and cost payback comparisons for various projects. <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.