Browse
Search
Agenda - 03-12-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-12-2013 - Work Session - Late
>
Agenda - 03-12-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:47:55 AM
Creation date
3/8/2013 2:26:44 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 03-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />October and a preliminary report will be presented at the School Board Planning Conference <br />on February 11 -12. The assessment reviewed the district's 10 oldest schools and facilities <br />identifying physical needs as well as programming deficiencies, code or life safety concerns, <br />accessibility limitations, environmental and mechanical /electrical deficiencies, and site <br />conditions. The final report will prioritize the deficiencies and include cost estimates for <br />corrective action. The 10 schools and facilities included in the assessment are Carrboro <br />Elementary School, Ephesus Elementary School, Estes Hills Elementary School, Glenwood <br />Elementary School, FP Graham Elementary School, Seawell Elementary School, Culbreth <br />Middle School, Phillips Middle School, Chapel Hill High School, and Lincoln Center. It is <br />anticipated the financial impact to address the deficiencies identified in the assessment will <br />be considerable. At this time, only a few preliminary needs are addressed in the 2013 -23 <br />CIP. We anticipate that the majority of the needs will be prioritized over the next year and as <br />such, future CIPs will be adjusted accordingly. <br />Last June, the county increased Pay -as- You -Go funding for FY 2012 -13 by approximately <br />$660,000. This base line increase is continued in this year's CIP. Additionally, the State has <br />increased anticipated Lottery Funds by almost $25,000 annually. These increases are <br />welcomed additions after many years of reductions in CIP funding. However after <br />accounting for the quarter cent sales tax, the total 2013 -23 ten year funding of $40,884,967 is <br />still a reduction of $10.8 Million from the 2008 -18 CIP budgeted funding of $51,756,848. <br />The recommended 2013 -23 CIP continues the 50% allocation of available funds to <br />Technology. The district strategic plan and the State's goals for creating 21st Century <br />schools stress the importance of providing students with individual access to technology. <br />Although the district has allocated a large percentage of available CIP funding toward <br />student laptops, current funding levels do not support a 2:1 or 1:1 program. A 21 st Century <br />curriculum also requires Future -Ready classrooms equipped with projection, audio, and <br />interactive systems. Gaps currently exist in the instructional technology available in new and <br />older schools within the district. These two needs are identified on the Unfunded Major <br />Project Schedule. <br />Additionally, the Funded Projects schedule includes the final year's funds to construct <br />Northside Elementary School that will open in August 2013. Also included on the Funded <br />Projects spreadsheet are estimates of full year income from the Article 46 1/4 cent sales tax <br />increase that was approved in 2011. It is recommended that FY 2013/14 Sales Tax funds be <br />used to address the most pressing deficiencies identified by the Facilities Assessment. <br />The CIP recommendation also includes an increase in Fire /Safety /Security Systems in FY <br />2013 -14. As part of our ongoing efforts to provide safe schools, and as a result of the <br />national attention on school security, reviews are being conducted with local law <br />enforcement departments and we want to have funding available if additional <br />recommendations are made. <br />An Unfunded Major Project Schedule is also included as part of the CIP. This list represents <br />a fraction of the known building deficiencies and school requests as well as Technology <br />needs. This schedule will undergo major modification as results of the Facilities Assessment <br />C:ADocuments and Settings\Administrator \Desktop \Webdocs \DA \CIP \CIP Abst.doc 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.