Orange County NC Website
32 <br />• ADA Compliance <br />Requested ADA funding was increased by $56,000 in 2013 -14 to address some important <br />compliance issues noted in the DPI report. <br />Energy Efficiency /Lighting Improvements <br />The Maintenance Department regularly replaces T -12 lighting bulbs and ballasts with the more <br />energy efficient T -8 bulbs and ballasts as they become inoperable. However, T -12 lights are in the <br />final years of phase out, making an accelerated effort to re -lamp entire facilities prudent. Funding <br />requested in the Lighting Category accomplishes the re- lamping of both Grady Brown and New <br />Hope Elementary Schools in their entirety over the course of three years. Additional schools will <br />be evaluated over the next year and included in future funding plans to ensure all facilities are re- <br />lamped systematically and in a timely manner. <br />The DPI report also recommends this item be addressed as soon as practicable. <br />• Electrical Systems <br />An additional $18,000 is requested for emergency generator and automatic transfer switch <br />installation at the Central Office, bringing the total request to $45,000. This will allow a sizeable <br />portion of the building to be functional in the event of power outage. <br />Orange High Heat Distribution System <br />Funding for professional services is requested to explore alternatives and prepare a design for <br />replacement of the steam lines at Orange High. Developments over the past several months have <br />caused concern regarding the longevity of the 50 -year old distribution system. Since this is a costly <br />system to replace, options, including phasing plans, will be explored with the consultant and will be <br />available for Board consideration later in the year. <br />During this fiscal year, staff will update the inventory, evaluate existing mechanical equipment and <br />create a replacement schedule, in order to better anticipate future replacement needs. <br />School Safety and Security <br />The Board recently received information about areas where enhanced security measures may be <br />called for at schools in the District. In order to present a comprehensive picture of these efforts a <br />section in the CIP entitled "School Safety and Security" was created. Related existing projects were <br />consolidated under this heading. While each of these projects had merit, there is no evidence of a <br />comprehensive approach to addressing this critical issue. Therefore, to promote consistent and <br />well- informed safety strategies in all facilities, an assessment by professionals trained in these <br />areas is recommended. The resulting recommendations are expected to include, but not be limited <br />to such things as architectural changes in facilities (security vestibules for example) and technology <br />enhancements (cameras, smart locks, etc.). Recommendations, complete with preliminary costs, <br />will allow the District to budget most effectively for safety needs in future CIPs; and will provide <br />reliable information for any grant opportunities that may arise. <br />• New Facilities <br />Last year's CIP included three new facilities: <br />- Cedar Ridge High School Auxiliary Gym <br />- Cedar Ridge High School Classroom Wing Addition <br />- Elementary #8 <br />Cedar Ridge High School Projects <br />A total of $300,000 was approved in 2012 -13 to begin preliminary planning for the two referenced <br />projects at Cedar Ridge High School. The combined estimated cost of $24,035,000 was requested <br />for funding between 2014 and 2016. The cost estimate prepared by Corley Redfoot Architects- <br />