Orange County NC Website
ATTACHMENT B <br />ORANGE COUNTY <br />BOARD OF EDUCATION <br />AGENDA ITEM ABSTRACT <br />Meeting Date: January 28, 2013 <br />AGENDA ITEM No. <br />ACTION ITEM: (Y /N) <br />SUBJECT: 2013 -2023 Proposed Capital Investment Plan Review <br />INFO. CONTACT: Pam Jones, Interim Aux Sry Exec Dir PHONE: 732 -8126 <br />ATTACHMENTS: <br />1. Proposed 2013 -2023 CIP by Category <br />2. Proposed 2013 -2023 CIP by Location <br />PURPOSE: To discuss projects and associated funding proposed for inclusion in the 2013 -2023 <br />Capital Investment Plan; and to provide direction to staff regarding finalization of the Plan for <br />submission to the County Commissioners. <br />31 <br />BACKGROUND: The attached spreadsheets outline projects identified for inclusion in the 10 -year <br />Capital Investment Plan for years 2013 -2023. There are two spreadsheets, identical in numbers, but <br />presented in two different formats: 1.) Presented by Category as prescribed by the County Budget <br />Office; 2.) Presented by Location so the Board can also see what work is proposed at each school. <br />Time constraints precluded an exhaustive review of projects in the out years, so in general, they remain <br />the same as in past CIPs, with a couple of notable exceptions discussed later in this abstract. <br />Likewise, many of the projects proposed for funding in 2013 -14 have not been changed, although <br />several have been added to reflect critical needs that were not previously addressed. A summary of <br />the additions to Year 1 are as follows: <br />• Roof Replacements <br />Replacement of specific roof sections at Central Elementary, Grady Brown Elementary, Efland <br />Cheeks Elementary and Orange High School is reflected in the District's roof replacement <br />schedule; and the need for replacement at this time has been confirmed by Staff and the roofing <br />consultant. This work was not included in previous CIPs. <br />In addition, future roofing needs consistent with the replacement schedule have been added to the <br />CIP in order to more adequately anticipate future funding needs. Roofing needs will be evaluated <br />annually as the CIP is updated and adjustments made as necessary, but in general should follow <br />the replacement schedule. <br />Some of this work was also recommended for immediate action in the DPI Facility Survey and <br />Recommendations Report (hereinafter referenced as the DPI report). <br />