Browse
Search
Agenda - 03-12-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-12-2013 - Work Session - Late
>
Agenda - 03-12-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:47:55 AM
Creation date
3/8/2013 2:26:44 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 03-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />2013 -14 CAPITAL BUDGET REQUESTS <br />SCHOOL /DEPARTMENT: Estes Hills Elementary School <br />Please list in priority order any capital project requests that are not currently in the Capital Investment Plan (CIP). <br />PRIORITY <br /># DESCRIPTION <br />JUSTIFICATION <br />20 <br />ESTIMATED <br />COST STATUS <br />1 <br />Replace /update kitchen equipment; stove top, serving line, and <br />Serving line needs to be more efficient, 2 of 3 burners don't <br />$ 20,000 <br />Article 46 Sales Tax <br />dishwasher. <br />work on stove top. <br />FY 2014 -15 <br />2 <br />Provide adequate draining on lower level sidewalk leading to <br />This is a safety issue for our campus. When it rains we have <br />$ 12,500 <br />Recurring Capital <br />blacktop. <br />huge puddles of standing water on the lower sidewalks. <br />3 <br />Refurbish media center: additional shelving, new carpet for floc <br />Our book collection is limited due to shelving. The <br />$23,000.00 <br />Funded CIP <br />update storage and office space in work area. <br />office /production area is cramped and not functional. <br />FY 2015 -16 <br />4 <br />Block roof access from the top level of the outside stairs leading <br />Safety - roof above the lower level is easily accessible to <br />$1,000.00 <br />Recurring Capital <br />to the lower level <br />students and strangers <br />5 <br />Add/extend canopy over outside entrance to Art Room. <br />This is an entrance for students moving to art every day. <br />$18,000.00 <br />Unfunded CIP <br />6 <br />Replace HVAC system in the Multi- Purpose Building <br />There is no temperature regulation in this building <br />$60,000 <br />Funded CIP <br />FY 2018 -19 <br />7 <br />Install sink in staff workroom <br />The only sink in the workroom is the small bathroom sink. This <br />$6,000 <br />Recurring Capital <br />is needed for staff health reasons. <br />GRAND TOTAL <br />$140,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.