Browse
Search
Agenda - 03-12-2013 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-12-2013 - Work Session - Late
>
Agenda - 03-12-2013 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:47:55 AM
Creation date
3/8/2013 2:26:44 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 03-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />2013 -14 CAPITAL BUDGET REQUESTS <br />SCHOOL /DEPARTMENT: Ephesus Elementary School <br />Please list in priority order any capital project requests that are not currently in the Capital Investment Plan (CIP). <br />PRIORITY <br /># DESCRIPTION OF PROJECT AND JUSTIFICATION <br />19 <br />ESTIMATED <br />COST STATUS <br />As administrators and other staff have come and gone, we have not maintained <br />appropriate records about keys. Additionally, some keys have been lost, unaccounted <br />for, and /or not returned by departing staff members. We feel that by replacing the <br />locks, we can start fresh, establish a secure system for record - keeping, and maintain <br />the security of our school. We'd also like to ask that staff members' new keys work to <br />open the common area of the main office, but not specific offices within that space. <br />Our SIT wants to share that most federal and other government buildings replace <br />1 replace locks and keys school -wide <br />locks and keys every 10 years. ? ?? <br />Under review <br />We would like additional video cameras installed to increase the security of our <br />building. Areas included are atrium and front parking lots, 2 cameras for hallways <br />outside of restrooms, and outside near the basement entrance. We feel that additional <br />surveillance outside will be a deterrent for vandals. Inside, we feel that additional <br />cameras will be a deterrent for thieves. We have had problems with both vandalism <br />Funded CIP <br />2 installation of additional video cameras <br />and theft this year. <br />15,000 FY 2013 -14 <br />Carpet Removal <br />in Recurring <br />In light of recent mold issues, we would like to have the carpet removed in several <br />Capital. New <br />offices and closets in the building as well as replaced in the media center. Because <br />installation to be <br />remove remaining carpet from building and <br />there is not ventilation in many of these spaces, we think this is especially important <br />priced and <br />3 replace carpet in the media center. <br />to our indoor air quality. <br />65,000 budgeted. <br />We would like to request that a fence with a gate be installed surrounding our 3 -5 <br />playground area. We have fencing in some areas, but feel that our students would be <br />safer if they were in a contained area during recess times. This is especially <br />Recurring <br />4 fencing <br />important when multiple classes and /or grade levels are outside at the same time. <br />7,500 Capital <br />As we have for the past few years, we wish to request that the district fund a portion <br />of our campus plan. We are ready to purchase the plan portion with funds raised at <br />the school level and once done, would like the district to contribute $5,000 to our first <br />5 campus plan <br />project. <br />5,000 Recurring Capital <br />GRAND TOTAL <br />$ <br />92,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.