Orange County NC Website
Water & Sewer Utilities Capital Projects <br />Fiscal Years 2013 -18 <br />Project Name Lake Orange Capital Maintenance Project Status Approved <br />Functional Service Area Community and Environment Starting Date 71112009 <br />Department Planning Completion Date 913012013 <br />Current <br />Year 1 Year 2 Year 3 Year 4 Year 5 Five <br />Year 6 <br />Prior Years Fiscal Year <br />Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Year <br />to <br />Project Budget Funding 2012 -13 <br />2013 -14 2014 -15 2015 -16 2016 -17 2017 -18 Total <br />Year 10 <br />Appropriation <br />Professional Design Services 70,310 <br />Land /Building <br />Construction /Repairs /Renovations 206,690 69,300 <br />- <br />Equi pm en t/Furni shin gs <br />- - - - - - <br />- <br />Total Project Budget 277,000 69,300 <br />General Fund Related Operating Costs <br />Personnel Services <br />Operations <br />New Debt Service <br />Total Operating Costs <br />- - - - - - <br />- <br />Revenues /Funding Source <br />Transfers from General Fund 165,000 69,300 <br />- <br />County Capital Fund Balance 112,000 <br />Total 277.000 69.300 <br />- - - - - - <br />- <br />Project Description /Justification <br />Lake Orange has been in operation since the late 1960s. Besides minor repairs and mowing of the dam, there has been no routine maintenance performed on the dam <br />or spillway over the last 40 years. In 2009, engineering staff initiated an inspection of the dam by a qualified engineer to identify and quantify some suspected <br />deficiencies in the dam and spillway. The result of this inspection was a report that prioritized several necessary repairs and suggested other ongoing maintenance <br />items. The most urgent of these repairs are going to be completed this fiscal year and are part of the capital project listed above. Also included in the capital project <br />listed is a project to modernize the gate technology at the Lake by installing a new gate that will be controlled electronically and can be monitored and adjusted remotely <br />After that, the routine maintenance suggested will not be part of a capital project, but will become part of the annual operation and maintenance budget for Lake Orange <br />.6 <br />