Browse
Search
Agenda - 03-12-2013 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-12-2013 - Work Session - Late
>
Agenda - 03-12-2013 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:47:03 AM
Creation date
3/8/2013 2:12:11 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2013
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 03-12-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Consensus Principles <br />February 9, 2010 <br />Page 2 of 4 <br />a. Point Sources: Large point sources as a group should be required to <br />achieve by 2016 a 20% reduction in 2006 nitrogen loads and a 40% <br />reduction in 2006 phosphorus loads. The allowable mass load for these <br />point sources should be allocated among them based on 110% of current <br />flows.Z Smaller point sources should be required to meet limits of <br />technology by 2016. <br />b. New Development: As soon as is reasonably feasible, and no later than <br />eighteen months after adoption of rules by the EMC, new development <br />throughout the Falls watershed should be required to meet a nitrogen <br />annual loading limit of 2.2 pounds per acre and a phosphorus annual <br />loading limit of 0.33 pounds per acre, a portion of which may be achieved <br />through offset payments. <br />c. Existing Development: No later than three years after adoption of the <br />rules by the EMC, all jurisdictions throughout the Falls watershed should <br />be required to begin and continuously implement a program to reduce <br />existing development nutrient loads to 2006 levels within ten years from <br />adoption of the rules by the EMC. <br />1. Where septic systems account for more than 20% of the nitrogen <br />loading in the portion of a subwatershed of Falls Lake within a <br />jurisdiction (according to DWQ's watershed model), that jurisdiction <br />should be required, as a part of its Stage 1 existing development <br />program, to begin and continuously implement a program to reduce <br />loading from septic systems, discharging into waters of the State <br />within that jurisdiction and subwatershed, which accounted any part <br />for nutrient loading for the jurisdiction. <br />2. A jurisdiction that includes any part of a subwatershed of Falls <br />Lake in which chlorophyll a levels have exceeded 40 ug/L in more <br />than 75% of the monitoring events in any calendar year should be <br />required, as a part of its Stage 1 existing development program, to <br />begin and continuously implement a program to reduce nutrient <br />loading into waters of the State within that jurisdiction and <br />subwatershed. <br />However, the total amount of nutrient loading reductions in Stage 1 is not <br />increased for local jurisdictions by the requirement to add specific <br />program components to address septic loading or high nutrient loading <br />levels. <br />d. State and Federal Agencies: State and federal agencies, including but not <br />limited to DOT, shall be required to reduce nitrogen and phosphorus <br />loading from new and existing development to a similar degree and within <br />a similar time schedule as local governments. <br />z The Consensus Principles rely on, and do not seek any change from, the apportionment of load allocations <br />as proposed by DWQ in the draft rules issued on January 14, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.