Browse
Search
Agenda - 03-07-2013 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-07-2013 - Regular Mtg.
>
Agenda - 03-07-2013 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:43:45 AM
Creation date
3/4/2013 4:58:08 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 03-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 4 <br />Part Project Task Description Flours Fee <br />2 Add FElei gh, Apex, Fol ly Springs and North Chatham to model from Part 1 <br />2.1 Analyze Cary emergency interconnections(#9, 6, 7, 47, 43, 32, 42, 44, 44, 45, 46, 50, 4, 3, 2, & 1) 400 $ 58,000 <br />1 Other information and interview Partners' staff <br />2 Update Apex model infrastructure <br />3 Add Fbleigh and Apex to model from Part 1 and add detalsat interconnections <br />4 Check model calibration at interconnections <br />5 Analyze Cary emergency i nterconnecti onswi th 42" pipe out of service <br />6 Analyze Cary emergency i nterconnecti onswi th CAWTF out of service <br />7 Present preliminary results <br />8 Prepare report chapter that incorporates review comments <br />9 oc <br />2.2 Analyze Apex- Fblly!3p►ingsinteroonnection (#21, 5,1, 2, 3,4) 240 $ 35,280 <br />1 Other information and interview Partners' staff <br />2 Add new Holly Springsmodel to core model and add detalsat interconnections <br />3 Identify more effi dent locationsfor current pump station <br />4 Identify i mprovementsfor 2 mgd to Holly Ipri ngs +3 mgd to Apex +7 mgd to Cary from Harnett <br />5 Determine sustainable flow from Apex to Holly Springs <br />6 Present preliminary results <br />7 Prepare report chapter that incorporates review comments <br />8 QC <br />2.3 Analyze flow between Cary and Chatham County (#48,1, 2, 3, 4) 240 $ 35,280 <br />1 Other information and interview Partners' staff <br />2 Add North Chatham County model to core model and add detailsfor connecting pipes <br />3 Determine flow from Cary through Apex to Chatham County <br />4 Determine flow from Chatham County through Apex to Crary <br />5 Present preliminary results <br />6 Prepare report chapter that incorporates review comments <br />7 QC <br />1031 -456 Potable Water Interconnection Study RVENAND SAMU <br />F,nuivanm NnK,i E u en� a ,uin noislz <br />
The URL can be used to link to this page
Your browser does not support the video tag.