Browse
Search
Agenda - 03-07-2013 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-07-2013 - Regular Mtg.
>
Agenda - 03-07-2013 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:43:45 AM
Creation date
3/4/2013 4:58:08 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 03-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 3 <br />Part Project Task Description Hours Fee <br />1.4 Analyze Hillsborough- Durhamintercamection (#16) 248 $ 37,840 <br />1 Other information and interview Partners' staff <br />2 Test three pumps and check model calibration at connection point <br />3 Identify improvementsfor 2 mgd from Durham to Hillsborough <br />4 Identify i mprovementsfor 4 mgd from Durham to Hi I Isborough i nd udi ng 2 mgd to Orange County <br />5 Identify improvementsfor 1 mgd to Durham <br />6 Present preliminary results <br />7 Prepare report chapter that incorporates review comments <br />8 QC <br />1.5 Analyze flow from Hillsborough to Orange County (#17,22) 208 $ 28,960 <br />1 Other information and interview Partners' staff <br />2 Update Orange AI arnance model and add to combi ned model <br />3 Check model calibration near i nterconnecti ons <br />4 Identify improvementsfor 0.75 mgd from HlIsborough through Orange Alarnance to Buckhorn ®D <br />5 Identify i mprovementsfor 0.75 mgd from Hl Isborough di rectly to Buckhorn ®D <br />6 Present preliminary results <br />7 Prepare report chapter that incorporates review comments <br />8 QC <br />Part 1 Totals 1,448 $215,280 <br />1031 -456 Potable Water Interconnection Study RVENAND SAMU <br />F,nuivanm NnK,i E u en� a ,uin noislz <br />
The URL can be used to link to this page
Your browser does not support the video tag.