Orange County NC Website
M <br />Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 2 <br />Scope of Services <br />Part Project Task Description Hours Fee <br />1 Build core model of Cary and Durham, then add 0WAS4Hillsborough Model <br />1. 1 Analyze Cary- Durham interoDnnections(#6, 7, 9) 368 $ 57,280 <br />1 Other information and interview Partners' staff <br />2 Update Cary model infrastructure <br />3 Update Durham model infrastructure <br />4 Combine Durham and Crary models & add interconnection details <br />5 Check model calibration near interconnections <br />6 Determine sustainable flow from Cary to Durhamwith existing interconnections(EPS) <br />7 Identify i mprovementsfor sustai ned flow of 10 mgd from Cory to Durham (EPS) <br />8 Determine sustainable flow from Durhamto Corywith existing interconnections(EPS) <br />9 Identify i mprovementsfor sustained flow of 7 mgd from Durham to Cory (EP) <br />10 Present preliminary results <br />11 Prepare report chapterthat incorporates review comments <br />12 QC <br />1.2 Analyze Durham- OWAS4lnterconnections(#25, 26, 27) 368 $ 51,840 <br />1 Other information and interview Partners' staff <br />2 Combine ONAS4- Hllsborough model with Durham -Cary model and add interconnection details <br />3 Check model calibration near interconnections <br />4 Determine sustainable flow from Durham to ONAS4 with no flow to Chatham (EPS) <br />5 Determine flow from Durham toONAS4with4 mgd point load to Chatham (at #10) <br />6 Identify i mprovementsfor 7 mgd from Durham to ONAS4 +4 mgd to Chatham (at #10) <br />7 Identify i mprovementsfor 9 mgd from Durham to ONAS4 inc2 mgd to Orange +4 mgd to Chatham <br />8 Determine sustainable flow from O7NASA to Durham with no flow to Chatham <br />9 Present preliminary results <br />10 Prepare report chapter that incorporates review comments <br />11 QC <br />1.3 Analyze Row between Cary and OWAS4through Durham (#6, 7, 9, 25, 26, 27) 256 $ 39,360 <br />1 Other information and interview Partners' staff <br />2 Identify improvements for sustained 5 mgd from Crary through Durham to ONAS4 off peak <br />3 Determine sustainable flow from ONAS4 through Durham to Cory <br />4 Present preliminary results <br />5 Prepare report chapter that incorporates review comments <br />6 QC <br />1031 -456 Potable Water Interconnection Study UVENAND SAMU <br />