Browse
Search
Agenda - 03-07-2013 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 03-07-2013 - Regular Mtg.
>
Agenda - 03-07-2013 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 10:43:45 AM
Creation date
3/4/2013 4:58:08 PM
Metadata
Fields
Template:
BOCC
Date
3/7/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 03-07-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 2 <br />Scope of Services <br />Part Project Task Description Hours Fee <br />1 Build core model of Cary and Durham, then add 0WAS4Hillsborough Model <br />1. 1 Analyze Cary- Durham interoDnnections(#6, 7, 9) 368 $ 57,280 <br />1 Other information and interview Partners' staff <br />2 Update Cary model infrastructure <br />3 Update Durham model infrastructure <br />4 Combine Durham and Crary models & add interconnection details <br />5 Check model calibration near interconnections <br />6 Determine sustainable flow from Cary to Durhamwith existing interconnections(EPS) <br />7 Identify i mprovementsfor sustai ned flow of 10 mgd from Cory to Durham (EPS) <br />8 Determine sustainable flow from Durhamto Corywith existing interconnections(EPS) <br />9 Identify i mprovementsfor sustained flow of 7 mgd from Durham to Cory (EP) <br />10 Present preliminary results <br />11 Prepare report chapterthat incorporates review comments <br />12 QC <br />1.2 Analyze Durham- OWAS4lnterconnections(#25, 26, 27) 368 $ 51,840 <br />1 Other information and interview Partners' staff <br />2 Combine ONAS4- Hllsborough model with Durham -Cary model and add interconnection details <br />3 Check model calibration near interconnections <br />4 Determine sustainable flow from Durham to ONAS4 with no flow to Chatham (EPS) <br />5 Determine flow from Durham toONAS4with4 mgd point load to Chatham (at #10) <br />6 Identify i mprovementsfor 7 mgd from Durham to ONAS4 +4 mgd to Chatham (at #10) <br />7 Identify i mprovementsfor 9 mgd from Durham to ONAS4 inc2 mgd to Orange +4 mgd to Chatham <br />8 Determine sustainable flow from O7NASA to Durham with no flow to Chatham <br />9 Present preliminary results <br />10 Prepare report chapter that incorporates review comments <br />11 QC <br />1.3 Analyze Row between Cary and OWAS4through Durham (#6, 7, 9, 25, 26, 27) 256 $ 39,360 <br />1 Other information and interview Partners' staff <br />2 Identify improvements for sustained 5 mgd from Crary through Durham to ONAS4 off peak <br />3 Determine sustainable flow from ONAS4 through Durham to Cory <br />4 Present preliminary results <br />5 Prepare report chapter that incorporates review comments <br />6 QC <br />1031 -456 Potable Water Interconnection Study UVENAND SAMU <br />
The URL can be used to link to this page
Your browser does not support the video tag.