Orange County NC Website
ATTACHM ENT 2 <br />Jordan Lake Partnership <br />Potable Water Interconnection Study <br />Phase 2: Hydraulic Modeling Proposal <br />Preliminary Conceptual Cost Sharing Approach for DISCUSS -10N PURPOSES ONLY Pmen-11al Scqve and Cos-, Sharing <br />Based on H&S Memo, 10/26/2012 <br />Drafted on 10/29/2012 <br />10 <br />Task <br />Description <br />Cost <br />a <br />cost per <br />E o 8 Participant <br />E .2 At fb (after base <br />6 subtracted) <br />I =0 <br />t k <br />Cary <br />Apex <br />Durham <br />OWASA <br />Hillsborough <br />Chatham <br />County <br />Pittsboro <br />Holly <br />Springs <br />Raleigh <br />Orange <br />County <br />1.1 <br />Analyze Cary-Durham Interconnections (#6, 7, 9) <br />$57,280 <br />x <br />............ ............ ........... ............ ............ ............ <br />............ ........... ............ ............ ............ - - - $9,738 <br />$9,738 <br />$9,738 <br />$9,738 <br />$9,738 <br />$0 <br />$0 <br />$0 <br />$0 <br />$9,738 <br />$0 <br />1.2 <br />Analyze Durham-OWASA Interconnections (#25, 26, 27) <br />$51,840 <br />x <br />$7,344 <br />$7,344 <br />$7,344 <br />$7,344 <br />$7,344 <br />$0 <br />$7,344 <br />$0 <br />$0 <br />$0 <br />$7,344 <br />1.3 <br />Analyze Flow between Cary and OWASA through Durham (#6, 7, 9, 25, 26, 27) <br />$39,360 <br />x <br />"Uz $8,364 <br />$8,364 <br />$8,364 <br />$8,364 <br />$8,364 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />1.4 <br />Analyze Hillsborough-Durham Interconnection (#16) <br />$37,840 <br />x <br />a <br />0 Nffl Nffl ZZ <br />��:Zl -Z-110 'N"" $10,721 <br />$0 <br />$0 <br />$10,721 <br />$0 <br />$10,721 <br />$0 <br />$0 <br />$0 <br />$0 <br />$10,721 <br />1.5 <br />Analyze Flow from Hillsborough to Orange County (#17, 22) <br />$28,960 <br />x <br />IN III IN 01,111", <br />R-- $24,616 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$24,616 <br />2.1 <br />Analyze Cary emergency interconnections (#9, 6, 7, 47, 43, 32, 42, 44, 45, 46, 50, 4, 3, 2, & 1) <br />$58,000 <br />x <br />$9,860 <br />$9860 <br />$9860 <br />$9860 <br />$9860 <br />$0 <br />$0 <br />$0 <br />$0 <br />$9,860 <br />$0 <br />2.2 <br />Analyze Apex -Holly Springs interconnection (#21, 5, 1, 2, 3, 4) <br />$35,280 <br />X <br />N 10 $5,998 <br />A <br />$5,998 <br />$5,998 <br />$5,998 <br />$5,998 <br />$0 <br />$0 <br />$0 <br />5,998 <br />$0 <br />$0 <br />2.3 <br />Analyze flow between Cary and Chatham County (#48, 1, 2, 3, 4) <br />$35,280 <br />x <br />$9996 <br />$9996 <br />$9,996 <br />$0 <br />$0 <br />$0 <br />$9,996 <br />$0 <br />$0 <br />$0 <br />$0 <br />2.4 <br />Analyze flow from Raleigh through Cary to Holly Springs and Apex (#46, 50, 4, 5) <br />$34,160 <br />x <br />$7,259 <br />$7,259 <br />$7,259 <br />$0 <br />$0 <br />$0 <br />$0 <br />$7,259 <br />$7,259 <br />0 <br />2.5 <br />Analyze flow from Durham to Apex (#J., 2, 3, 4, 6, 7, 9) <br />$30,600 <br />x <br />$5,202 <br />$5,202 <br />$5,202 <br />$5,202 <br />$5,202 <br />$0 <br />$0 <br />$0 <br />$0 <br />$5,202 <br />$0 <br />2.6 <br />Analyze Cary -Durham-Raleigh interconnections in 2060 (#9, 6, 7, 47, 43, 32, 42, 44, 45, 46, 25, <br />$72,720 <br />x <br />$12,362 <br />$12,362 <br />$12,362 <br />$12,362 <br />$12,362 <br />$0 <br />$0 <br />$0 <br />$0 <br />$12,362 <br />$0 <br />Base Participation <br />$72,198 <br />i'LINS, <br />x x x x x x x x x x $7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />$7,220 <br />Total <br />$481,320 <br />1 1 1 1 1 1 <br />1 $83,342 <br />$83,342 <br />$76,809 <br />$66,087 <br />$17,941 <br />$24,560 <br />$7,220 <br />$20,476 <br />$51,641 <br />$42221 <br />$481,320 <br />