Orange County NC Website
4 <br /> 6 <br /> February 25,2000 <br /> ATTACHMENT B <br /> COST ESTIMATES FOR <br /> PROPOSED WATER MAIN EXTENSION PROJECT FOR <br /> ROGERS ROAD AREA <br /> COSTS ' <br /> 1. Line 1, 12"WM Along Rogers Road,From Allen $226,000 <br /> To Chapel Hill Urban Transition Boundary(3,560 LF) <br /> 2. Line 6 8"WM Along Ruuch Road(850 LF) 40,000 <br /> 3. Line 7 8"WM along Purefoy Road(1,120 LF) 48,000 <br /> 4. Line 8 8"WM Along Sandburg Lane(890 LF) 43,000 <br /> 5. Line 9 9"WM In Rauch Road/Purefoy Road 137,000 <br /> Area North and East of Rogers Road(2,920 LF) <br /> 6. Line 10 8" WM In Allen Street and Properties South(1,180 LF) 40,000 <br /> 7. Estimated Cost of Design,Easement and Construction 534,000 <br /> 8. Estimated Cost of OWASA's Administrative Overhead(3%) 16,000 <br /> TOTAL ESTIMATED COST OF THE PROJECT 5550,000 <br /> ' All costs am based on report titled,"Cost Estimates for Extending the Water and Sewer Systems to Serve <br /> the Area Near the Orange County Sanitary Landfill",dated October, 1997.Cost are inflated by 5%per year <br /> to reflect Year 2000 dollars, <br />