Browse
Search
2000 S Contract - Acquisition of Register of Deeds Imaging System
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 S Contract - Acquisition of Register of Deeds Imaging System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 11:02:04 AM
Creation date
2/25/2013 4:18:25 PM
Metadata
Fields
Template:
BOCC
Date
4/17/2000
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8i
Document Relationships
Agenda - 04-17-2000-8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 04-17-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> Exhibit A <br /> Definition of Focus and Deliverables for Consulting Agreement <br /> Phase 1: Preliminary Investigations <br /> (Covers Steps I and 2 of Assessment Report Recommendations) <br /> Focus for Advisory Consulting: <br /> Discussions with OC personnel,IS,and Vendor(Mackin Systems)re needs for transition plan. We will <br /> include topics of the objectives,schedule,and vendor deliverables.We will also investigate adequacy <br /> of system for later expansion from Vital Records only to include Deeds. <br /> Documentation provided: <br /> Draft of Transition Plan for OC review. <br /> Phase 2: Pilot System Installation and Test <br /> (Covers Step 3 of Assessment Report Recommendations) <br /> Focus for Advisory Consulting: <br /> Define Objectives for Pilot <br /> Emphasis on Vital Records Conversion validation <br /> Discussions with vendor re scope of demonstrations <br /> Establish acceptance criteria and procedures <br /> Evaluation and recommendations re adequacy of system and demonstrations <br /> Documentation provided: <br /> Comments and Recommendations re findings during demonstration <br /> Comments on any needed revisions to Transition Plan <br /> Outline for Acceptance Procedures <br /> Phase 3: System Procurement, Installation and Test <br /> (Covers Step 4 of Assessment Report Recommendations) <br /> Focus for Advisory Consulting: <br /> Discussions with OC and vendor re system configuration and customization <br /> Discussions with OC and vendor re acceptance criteria and procedures <br /> Documentation provided: <br /> Recommendations for revisions in Transition Plan <br /> Suggestions re use of vendor consulting or outside services <br /> Phase 4: System Extensions to Deeds <br /> (Covers Step 5 of Assessment Report Recommendations) <br /> Focus for Advisory Consulting: <br /> Investigate feasibility and any technical requirements for Deeds <br /> Discuss best methods to interface to other OC systems <br /> Documentation provided: <br /> Recommendations re Deeds system migration <br /> Suggestions re long-term enhancements or extensions to system <br /> Note:Documentation noted above will require and incorporate written input from IS and from vendor,as identified and <br /> agreed during the course of the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.