D. Contractor has carefully studied all: (1)reports of explorations and tests of subsurface conditions at or contiguous to
<br /> the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or
<br /> contiguous to the Site(except Underground Facilities)which have been identified inthe Supplementary Conditions as
<br /> provided in Paragraph 4.02 of the General Conditions and(2)reports and drawings of a Hazardous Environmental
<br /> Condition,if any,at the Site which has been identified in the Supplementary Conditions as provided in Paagraph 4.06
<br /> of the General Conditions.
<br /> E. Contractor has obtained and carefully studied(or assumes responsibility for doing so)all additional or supplementary
<br /> examinations,investigations,explorations,tests,studies,and data concerning condilons,(surface,subsurface,and
<br /> Underground Facilities)at or contiguous to the Site which may affect cost,progress,or performance of the Work or
<br /> which relate to any aspect of the means,methods,techniques,sequences,and procedures of constructionto be
<br /> employed by Contractor,including any specific means,methods,techniques,sequences,and procedures of
<br /> construction expressly required by the Bidding Documents,and safety precautions and programs incident thereto.
<br /> F. Contractor does not consider that any further examinations,investigations,explorations,tests,studies,or data are
<br /> necessary for the performance of the Work at the Contract Price,within the Contract Times,and in accordance with the
<br /> other terms and conditions of the Contract Documents.
<br /> G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the
<br /> Work as indicated in the Contract Documents.
<br /> H. Contractor has correlated the information known to Contractor,information and observations obtained from visits to
<br /> the Site,reports and drawings identified in the Contract Documents,and all additional examinations,investigations,
<br /> explorations,tests,studies,and data with the Contract Documents.
<br /> I. Contractor has given Engineer written notice of all conflicts,errors,ambiguities,or discrepancies that Contractor has
<br /> discovered in the Contract Documents,and the written resolution thereof by Engineer is acceptable to Contractor.
<br /> J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for
<br /> performance and furnishing of the Work.
<br /> ARTICLE 9-CONTRACT DOCUMENTS
<br /> 9.01 Contents
<br /> A. The Contract Documents,in the order of priority for resolving ccnflicts,consist of the following:
<br /> 1. This Agreement(pages I to 71 inclusive).
<br /> 2. Drawings consisting of all sheets with each sheet bearing the following general title: Buckhorn-Mebane EDD
<br /> Phase 2 Water and Sewer Improvements[or]the Drawings listed on attached sheet index.
<br /> 3. Specifications as listed in the table of contents of the Project Manual.
<br /> 4. Addenda(numbers_to_,inclusive).
<br /> 5. General Conditions(pages I to 41,inclusive).
<br /> 6. Supplementary Conditions(pages I to 4,inclusive).
<br /> 7. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not
<br /> attached hereto:
<br /> a. Notice to Proceed(pages I to 1,inclusive).
<br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price)
<br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 005204