Orange County NC Website
D. Contractor has carefully studied all: (1)reports of explorations and tests of subsurface conditions at or contiguous to <br /> the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or <br /> contiguous to the Site(except Underground Facilities)which have been identified inthe Supplementary Conditions as <br /> provided in Paragraph 4.02 of the General Conditions and(2)reports and drawings of a Hazardous Environmental <br /> Condition,if any,at the Site which has been identified in the Supplementary Conditions as provided in Paagraph 4.06 <br /> of the General Conditions. <br /> E. Contractor has obtained and carefully studied(or assumes responsibility for doing so)all additional or supplementary <br /> examinations,investigations,explorations,tests,studies,and data concerning condilons,(surface,subsurface,and <br /> Underground Facilities)at or contiguous to the Site which may affect cost,progress,or performance of the Work or <br /> which relate to any aspect of the means,methods,techniques,sequences,and procedures of constructionto be <br /> employed by Contractor,including any specific means,methods,techniques,sequences,and procedures of <br /> construction expressly required by the Bidding Documents,and safety precautions and programs incident thereto. <br /> F. Contractor does not consider that any further examinations,investigations,explorations,tests,studies,or data are <br /> necessary for the performance of the Work at the Contract Price,within the Contract Times,and in accordance with the <br /> other terms and conditions of the Contract Documents. <br /> G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the <br /> Work as indicated in the Contract Documents. <br /> H. Contractor has correlated the information known to Contractor,information and observations obtained from visits to <br /> the Site,reports and drawings identified in the Contract Documents,and all additional examinations,investigations, <br /> explorations,tests,studies,and data with the Contract Documents. <br /> I. Contractor has given Engineer written notice of all conflicts,errors,ambiguities,or discrepancies that Contractor has <br /> discovered in the Contract Documents,and the written resolution thereof by Engineer is acceptable to Contractor. <br /> J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for <br /> performance and furnishing of the Work. <br /> ARTICLE 9-CONTRACT DOCUMENTS <br /> 9.01 Contents <br /> A. The Contract Documents,in the order of priority for resolving ccnflicts,consist of the following: <br /> 1. This Agreement(pages I to 71 inclusive). <br /> 2. Drawings consisting of all sheets with each sheet bearing the following general title: Buckhorn-Mebane EDD <br /> Phase 2 Water and Sewer Improvements[or]the Drawings listed on attached sheet index. <br /> 3. Specifications as listed in the table of contents of the Project Manual. <br /> 4. Addenda(numbers_to_,inclusive). <br /> 5. General Conditions(pages I to 41,inclusive). <br /> 6. Supplementary Conditions(pages I to 4,inclusive). <br /> 7. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not <br /> attached hereto: <br /> a. Notice to Proceed(pages I to 1,inclusive). <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 005204 <br />