| D.  Contractor has carefully studied all: (1)reports of explorations and tests of subsurface conditions at or contiguous to
<br />  			the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or
<br />  			contiguous to the Site(except Underground Facilities)which have been identified inthe Supplementary Conditions as
<br />  			provided in Paragraph 4.02 of the General Conditions and(2)reports and drawings of a Hazardous Environmental
<br />  			Condition,if any,at the Site which has been identified in the Supplementary Conditions as provided in Paagraph 4.06
<br />  			of the General Conditions.
<br />    		E.   Contractor has obtained and carefully studied(or assumes responsibility for doing so)all additional or supplementary
<br />  			examinations,investigations,explorations,tests,studies,and data concerning condilons,(surface,subsurface,and
<br />  			Underground Facilities)at or contiguous to the Site which may affect cost,progress,or performance of the Work or
<br />  			which relate to any aspect of the means,methods,techniques,sequences,and procedures of constructionto be
<br />  			employed by Contractor,including any specific means,methods,techniques,sequences,and procedures of
<br />  			construction expressly required by the Bidding Documents,and safety precautions and programs incident thereto.
<br />    		F.   Contractor does not consider that any further examinations,investigations,explorations,tests,studies,or data are
<br />  			necessary for the performance of the Work at the Contract Price,within the Contract Times,and in accordance with the
<br />  			other terms and conditions of the Contract Documents.
<br />    		G.  Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the
<br />  			Work as indicated in the Contract Documents.
<br />    		H.  Contractor has correlated the information known to Contractor,information and observations obtained from visits to
<br />  			the Site,reports and drawings identified in the Contract Documents,and all additional examinations,investigations,
<br />  			explorations,tests,studies,and data with the Contract Documents.
<br />    		I.   Contractor has given Engineer written notice of all conflicts,errors,ambiguities,or discrepancies that Contractor has
<br />  			discovered in the Contract Documents,and the written resolution thereof by Engineer is acceptable to Contractor.
<br />    		J.   The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for
<br />  			performance and furnishing of the Work.
<br /> 		ARTICLE 9-CONTRACT DOCUMENTS
<br />  		9.01   Contents
<br />    		A.  The Contract Documents,in the order of priority for resolving ccnflicts,consist of the following:
<br />  			1.   This Agreement(pages I to 71 inclusive).
<br /> 			2.   Drawings consisting of all sheets with each sheet bearing the following general title: Buckhorn-Mebane EDD
<br />       			Phase 2 Water and Sewer Improvements[or]the Drawings listed on attached sheet index.
<br /> 			3.   Specifications as listed in the table of contents of the Project Manual.
<br /> 			4.   Addenda(numbers_to_,inclusive).
<br /> 			5.   General Conditions(pages I to 41,inclusive).
<br /> 			6.   Supplementary Conditions(pages I to 4,inclusive).
<br /> 			7.   The following which may be delivered or issued on or after the Effective Date of the Agreement and are not
<br />       			attached hereto:
<br />       			a.  Notice to Proceed(pages I to 1,inclusive).
<br />    			EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price)
<br />   					Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />     										005204
<br /> |