2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:07:41 PM
Creation date
2/25/2013 12:10:54 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7c
Document Relationships
Agenda - 11-08-2012 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 11-08-2012 - Regular Mtg.
R 2013-069 Planning - J F Wilkerson Contracting -Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.03 Liquidated Damages <br /> A. Contractor and Owner recognize that time is of the essence of this Agreement and that Owner will suffer financial loss <br /> if the Work is not completed within the times specified in Paragraph 4.02 above,plus any extensions thereof allowed <br /> in accordance with Article 12 of the General Conditions. The parties also recognize the delays,expense,and <br /> difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not <br /> completed on time. Accordingly,instead of requiring anysuch proof,Owner and Contractor agree that as liquidated <br /> damages for delay(but not as a penalty),Contractor shall pay Owner$500.00 for each day that expires after the time <br /> specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial <br /> Completion,if Contractor shall neglect,refuse,or fail to complete the remaining Work within the Contract Time or <br /> any proper extension thereof granted by Owner,Contractor shall pay Owner$500.00 or each day that expires after the <br /> time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready <br /> for final payment. <br /> B. Failure of the Contractor to commence construction within ten (10) days of the Notice to Proceed shall begin a daily <br /> penalty to the Contractor at a rate of fifty percent(50%)of the daily liquidated damages specified in Paragraph 4.03(A) <br /> ARTICLE 5-CONTRACT PRICE <br /> 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in <br /> current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.0l.A,5.0l.B,and 5.01.0 below: <br /> A. For all Work other than Unit Price Work,a Lump Sum of- <br /> NA ($ NA <br /> (words) (numerals) <br /> All specific cash allowances are included in the above price and have been computed in accordance with paragraph <br /> 11.02 of the General Conditions. <br /> B. For all Unit Price Work,an amount equal to the sum of the established unit price for each separately identified item of <br /> Unit Price Work times the estimated quantity of that item as indicated in this paragraph 5.0l.B: <br /> As provided in Paragraph 11.03 of the General Conditions,estimated quantities are not guaranteed,and determinations <br /> of actual quantities and classifications are to be made by Engineer as provided in Paragraph 9.07 of the General <br /> Conditions. Unit prices have been computed as provided in Paragraph 11.03 of the General Conditions. <br /> UNIT PRICE WORK <br /> SEE ATTACHED SCHEDULE OF BID ITEMS <br /> TOTAL OF ALL ESTIMATED PRICES: <br /> Four Million Sixteen Thousand Five Hundred Forty Five and 74/100 Dollars $4,016,545.74 <br /> (words) (numerals) <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00520-2 <br />