Orange County NC Website
' ^ <br /> , <br /> Bond shall be construed oaa statutory bond and not asa Construction Contract,architectural and engineering <br /> common law bond. services required for performance of the work of the <br /> 14 Upon request by any person or entity appearing to be a Contractor and the Contractors subcontractors,and <br /> oUotheritam�forwhi�hammmohoni�eUenrn�ybo <br /> potential benefidmryof this Bond, the Contractor ohaU �ue*/�din the]ur�dic1�nwhere the labor, metmha|o <br /> prompdyfurniah�oopyofthiaBnndorohaUpennbacopy <br /> tob*made. nr equipment were furnished. <br /> 15 DEFINITIONS 15.2 Construction Contract:^'Theagreement between <br /> the Owner and the Contractor identified on the oig' <br /> 15.1Qaimant:An|ndividua|orentityhavingadinont nature page, including all Contract Document and <br /> contract with the Contractor or with o subcontractor of changes thereto, <br /> the Contractor bo furnish|abormm�h*h�|�ormquip- <br /> ' 15'3 Owner Default: <br /> Failure nf the Owner,which has <br /> mant for use in the performance pf the Contract.The <br /> neither bo pay the��on' <br /> intartofthieBondohaUbetoinu|udovv�hout|imKa- waived, <br /> tno�oromrequired hytheConmbo�ionContnmctor»n hon|n1hetenns'|abor'materials or equipment"th�� <br /> perform <br /> and complete or comply with the other terms <br /> part of water, power, light, heat, oil, gasoline, <br /> thereof. <br /> telephone service or rental equipment used inthe <br /> MODIFICATIONS TO THIS BOND ARE ASFOLLOWS: <br /> 1. Paragraph 5 above shall be amended to delete the word"or"and insert the word"and"in its place. <br /> 2. Paragraph O above is deleted in its entirety and replaced with the following: <br /> ^S After the Claimant has satisfied the conditions of Paragraph 4 and submitted all supporting documentation and <br /> any proof of claim requested by the Surety,then the Surety shall,with reasonable promptness,(1)notify the <br /> Claimant of the amounts that are undisputed and the basis for challenging any amounts-that are disputed,including, <br /> but not limited to,the lack of substantiating documentation to support the claim as 10 entitlement or amount,and(2) <br /> pay or make arrangements for payment of any undisputed amount. The failure of the Surety to timely discharge its <br /> obligations under this paragraph or to dispute or identify any specific defense to all or any part of a claim shall not <br /> be deemed to be an admission of liability by the Surety as to such claim or otherwise constitute a waiver of the <br /> Contractor's or Surety's defenses to,or right to dispute,such claim." <br /> (Space is provided below for additional signatures of added parties,other than those appearing on the cover page.) <br /> CONTRACTOR ASPRINCIPAL SURETY <br /> Company: (Corporate Gwa0 Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT wm12'PERFORMANCE BOND AND PAYMENT BOND-DECEMBER 1Su4so 'xwx�> <br /> � A312-1984 6 <br /> p.9748n(3n1} <br />